Modeling the time-to-corrosion cracking in chloride contaminated reinforced concrete structures

被引:17
|
作者
Liu, YP [1 ]
Weyers, RE [1 ]
机构
[1] Virginia Polytech Inst & State Univ, Ctr Infrastruct Assessment & Management, Blacksburg, VA 24061 USA
关键词
chloride-induced corrosion; concrete; corrosion cracking model; time-to-cracking;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The time-to-cracking, from corrosion initiation to cracking of the reinforcing steel cover concrete, is one of the critical time periods for modeling the time to repair; rehabilitate, and replace reinforced concrete structures in corrosive environments. The time to corrosion cracking was experimentally determined from simulated bridge deck slabs. The experimental design considered corrosion rate, concrete cover depth, reinforcing steel bar spacing, and size. Three of the 14 slab series cracked during the 5-year study. Metal loss was determined for the cracked specimens that had cover depths of 1, 2, and 3 in. (25, 51, and 76 mm). A rime to corrosion cracking model was developed that considered the critical amount of corrosion products that consists of the amount of corrosion products needed to fill the interconnected void space around the reinforcing bar plus the amount of corrosion products needed to generate sufficient tensile stresses to crack the cover concrete. The experimentally observed time to cracking is in good agreement with the model predicted time to cracking.
引用
收藏
页码:675 / 681
页数:7
相关论文
共 50 条
  • [1] Modeling time-to-corrosion cracking in chloride contaminated reinforced concrete structures. Discussion
    Li, CQ
    [J]. ACI MATERIALS JOURNAL, 1999, 96 (05) : 611 - 613
  • [2] Modeling the time-to-corrosion cracking of reinforced concrete structures by finite element
    Castorena, J. H.
    Almeraya-Calderon, F.
    Velasquez, J. I.
    Gaona-Tiburcio, C.
    Cardenas, A. I.
    Barrios-Durstewitz, C.
    Leon, L. Lopez
    Martinez-Villafane, A.
    [J]. CORROSION, 2008, 64 (07) : 600 - 606
  • [3] Modeling of time to corrosion cracking in reinforced concrete structures
    Lin, Gang
    Xiang, Zhihai
    Liu, Yinghua
    [J]. Qinghua Daxue Xuebao/Journal of Tsinghua University, 2010, 50 (07): : 1125 - 1129
  • [4] Determination of the time-to-corrosion of concrete structures
    Raupach, M
    [J]. ICACS 2003: INTERNATIONAL CONFERENCE ON ADVANCES IN CONCRETE AND STRUCTURES, VOL 1 AND 2, 2003, 32 : 516 - 525
  • [5] Modeling of time to corrosion-induced cover cracking in reinforced concrete structures
    Bhargava, K
    Ghosh, AK
    Mori, Y
    Ramanujam, S
    [J]. CEMENT AND CONCRETE RESEARCH, 2005, 35 (11) : 2203 - 2218
  • [6] Modeling of time to corrosion-induced cover cracking in reinforced concrete structures
    Lu, Chunhua
    Zhao, Yuxi
    Jin, Weiliang
    [J]. Jianzhu Jiegou Xuebao/Journal of Building Structures, 2010, 31 (02): : 85 - 92
  • [7] Corrosion Inhibitors for the Rehabilitation of Chloride Contaminated Reinforced Concrete Structures
    Hunkeler, Fritz
    Muehlan, Bjoern
    Ungricht, Heidi
    [J]. BETON- UND STAHLBETONBAU, 2011, 106 (03) : 187 - 196
  • [8] PREDICTING THE PROPAGATION TIME DUE TO GENERAL CORROSION IN CHLORIDE CONTAMINATED REINFORCED CONCRETE STRUCTURES
    Zhang, Juhui
    Cheung, Moe M. S.
    [J]. INTERNATIONAL SYMPOSIUM ON LIFE-CYCLE PERFORMANCE OF BRIDGES AND STRUCTURES, 2010, : 564 - 571
  • [9] Modeling the dynamic corrosion process in chloride contaminated concrete structures
    Liu, T
    Weyers, RW
    [J]. CEMENT AND CONCRETE RESEARCH, 1998, 28 (03) : 365 - 379
  • [10] Time-to-Corrosion Initiation of Chloride-Exposed Reinforced Concrete Considering Time Dependence of the Diffusion Coefficient
    Hartt, William H.
    [J]. CORROSION, 2013, 69 (08) : 821 - 827