Modeling time-to-corrosion cracking in chloride contaminated reinforced concrete structures. Discussion

被引:0
|
作者
Li, CQ [1 ]
机构
[1] Monash Univ, Dept Civil Engn, Clayton, Vic 3168, Australia
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:611 / 613
页数:3
相关论文
共 50 条
  • [1] Modeling the time-to-corrosion cracking in chloride contaminated reinforced concrete structures
    Liu, YP
    Weyers, RE
    [J]. ACI MATERIALS JOURNAL, 1998, 95 (06) : 675 - 681
  • [2] Modeling the time-to-corrosion cracking of reinforced concrete structures by finite element
    Castorena, J. H.
    Almeraya-Calderon, F.
    Velasquez, J. I.
    Gaona-Tiburcio, C.
    Cardenas, A. I.
    Barrios-Durstewitz, C.
    Leon, L. Lopez
    Martinez-Villafane, A.
    [J]. CORROSION, 2008, 64 (07) : 600 - 606
  • [3] Modeling of time to corrosion cracking in reinforced concrete structures
    Lin, Gang
    Xiang, Zhihai
    Liu, Yinghua
    [J]. Qinghua Daxue Xuebao/Journal of Tsinghua University, 2010, 50 (07): : 1125 - 1129
  • [4] Determination of the time-to-corrosion of concrete structures
    Raupach, M
    [J]. ICACS 2003: INTERNATIONAL CONFERENCE ON ADVANCES IN CONCRETE AND STRUCTURES, VOL 1 AND 2, 2003, 32 : 516 - 525
  • [5] Modeling of time to corrosion-induced cover cracking in reinforced concrete structures
    Bhargava, K
    Ghosh, AK
    Mori, Y
    Ramanujam, S
    [J]. CEMENT AND CONCRETE RESEARCH, 2005, 35 (11) : 2203 - 2218
  • [6] Modeling of time to corrosion-induced cover cracking in reinforced concrete structures
    Lu, Chunhua
    Zhao, Yuxi
    Jin, Weiliang
    [J]. Jianzhu Jiegou Xuebao/Journal of Building Structures, 2010, 31 (02): : 85 - 92
  • [7] Corrosion Inhibitors for the Rehabilitation of Chloride Contaminated Reinforced Concrete Structures
    Hunkeler, Fritz
    Muehlan, Bjoern
    Ungricht, Heidi
    [J]. BETON- UND STAHLBETONBAU, 2011, 106 (03) : 187 - 196
  • [8] PREDICTING THE PROPAGATION TIME DUE TO GENERAL CORROSION IN CHLORIDE CONTAMINATED REINFORCED CONCRETE STRUCTURES
    Zhang, Juhui
    Cheung, Moe M. S.
    [J]. INTERNATIONAL SYMPOSIUM ON LIFE-CYCLE PERFORMANCE OF BRIDGES AND STRUCTURES, 2010, : 564 - 571
  • [9] Modeling the dynamic corrosion process in chloride contaminated concrete structures
    Liu, T
    Weyers, RW
    [J]. CEMENT AND CONCRETE RESEARCH, 1998, 28 (03) : 365 - 379
  • [10] Time-to-Corrosion Initiation of Chloride-Exposed Reinforced Concrete Considering Time Dependence of the Diffusion Coefficient
    Hartt, William H.
    [J]. CORROSION, 2013, 69 (08) : 821 - 827