Capacity expansion planning for wind power and energy storage considering hourly robust transmission constrained unit commitment

被引:26
|
作者
Zhou, Yuzhou [1 ]
Zhai, Qiaozhu [1 ]
Yuan, Wei [2 ]
Wu, Jiang [1 ]
机构
[1] Xi An Jiao Tong Univ, Syst Engn Inst, MOEKLINNS, Xian 710049, Peoples R China
[2] State Grid Energy Res Inst Co LTD, Dept New Energy & Stat, Beijing, Peoples R China
基金
中国国家自然科学基金;
关键词
Capacity expansion planning; Wind power; Energy storage; Multistage operation; Long-term robust TCUC; RENEWABLE ENERGY; OPTIMIZATION; SOLAR;
D O I
10.1016/j.apenergy.2021.117570
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The installed capacity of renewable energy in power systems is rising rapidly in recent years due to environmental pressure. And as the main asset of mitigating renewable output fluctuations, energy storage (ES) also has been greatly developed with the increase of renewable capacity. To this end, the capacity planning of renewables and ESs has drawn much attention and many methods have been proposed. In the formulations of capacity planning problems, more detailed and complicated operation constraints mean more accurate planning results, which is the consensus of many researchers. However, to guarantee the problem formulation tractable, the actual multistage operation process of power system is not properly considered in existing planning methods. Therefore, in this paper, a new capacity expansion planning method for wind power and ESs is proposed considering the actual multistage operation process of power system. Specially, the hourly robust transmission constrained unit commitment (TCUC) and economic dispatch (ED) are involved in this planning method and thus, it could accurately evaluate the operational cost under certain planning decision. Besides, to guarantee the solvability and computational efficiency of planning method, a parallel horizon-splitting method is improved to solve the long-time-horizon hourly robust TCUC problem, and a genetic algorithm nested gradient descent method is established to accelerate the solving of planning problem. With the actual multistage operation process, a more reasonable expansion planning decision is obtained and the computational efficiency is greatly improved by the proposed acceleration algorithm. Numerical tests verify the efficacy of proposed method.
引用
收藏
页数:13
相关论文
共 50 条
  • [21] Robust Transmission Network Expansion Planning Problem Considering Storage Units
    Garcia-Cerezo, Alvaro
    Baringo, Luis
    Garcia-Bertrand, Raquel
    [J]. 2019 2ND INTERNATIONAL CONFERENCE ON SMART ENERGY SYSTEMS AND TECHNOLOGIES (SEST 2019), 2019,
  • [22] Transmission Expansion Planning Considering the Deployment of Energy Storage Systems
    Hu, Zechun
    Zhang, Fang
    Li, Baowei
    [J]. 2012 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING, 2012,
  • [23] Transmission Expansion Planning Considering Storage, Flexible AC Transmission System, Losses, and Contingencies to Integrate Wind Power
    Huanca, Dany H.
    Falcao, Djalma M.
    Bento, Murilo E. C.
    [J]. ENERGIES, 2024, 17 (07)
  • [24] Robust Security Constrained Unit Commitment under Uncertain Wind Power Generation
    Hasanzad, Fardin
    Rastegar, Hasan
    [J]. 2020 10TH SMART GRID CONFERENCE (SGC), 2020,
  • [25] Enhanced generation, energy storage and transmission expansion planning for renewables with operational flexibility through unit commitment
    Wijekoon, Semini
    Liebman, Ariel
    Aleti, Aldeida
    Dunstall, Simon
    [J]. 2019 MODERN ELECTRIC POWER SYSTEMS (MEPS), 2019,
  • [26] Study on Wind Power Consumption Capacity of Power Grid Considering Risk and Unit Commitment
    Fu, Kening
    Jia, Yanbing
    Han, Xiaoqing
    Xiang, Yingping
    Wang, Peng
    [J]. 2018 IEEE POWER & ENERGY SOCIETY GENERAL MEETING (PESGM), 2018,
  • [27] A New Unit Commitment Model Considering Wind Power and Pumped Storage Power Station
    Sheng Siqing
    Sun Xiaoxia
    [J]. 2014 IEEE WORKSHOP ON ELECTRONICS, COMPUTER AND APPLICATIONS, 2014, : 743 - 746
  • [28] Robust optimization of unit commitment with wind power considering composite flexibility constraints
    Ma, Yinghao
    Liu, Chen
    Yang, Hejun
    Zhang, Dabo
    [J]. INTERNATIONAL JOURNAL OF ELECTRICAL POWER & ENERGY SYSTEMS, 2023, 151
  • [29] Two-stage chance-constrained unit commitment based on optimal wind power consumption point considering battery energy storage
    Chen, Zhe
    Li, Zhengshuo
    Guo, Chuangxin
    Ding, Yi
    He, Yubin
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2020, 14 (18) : 3738 - 3749
  • [30] Capacity Credit Assessment of Wind Power Considering Energy Storage
    Wu, Chi
    Chen, Lijuan
    Zeng, Pingliang
    Xu, Xiaohui
    [J]. 2014 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2014,