Capacity expansion planning for wind power and energy storage considering hourly robust transmission constrained unit commitment

被引:26
|
作者
Zhou, Yuzhou [1 ]
Zhai, Qiaozhu [1 ]
Yuan, Wei [2 ]
Wu, Jiang [1 ]
机构
[1] Xi An Jiao Tong Univ, Syst Engn Inst, MOEKLINNS, Xian 710049, Peoples R China
[2] State Grid Energy Res Inst Co LTD, Dept New Energy & Stat, Beijing, Peoples R China
基金
中国国家自然科学基金;
关键词
Capacity expansion planning; Wind power; Energy storage; Multistage operation; Long-term robust TCUC; RENEWABLE ENERGY; OPTIMIZATION; SOLAR;
D O I
10.1016/j.apenergy.2021.117570
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The installed capacity of renewable energy in power systems is rising rapidly in recent years due to environmental pressure. And as the main asset of mitigating renewable output fluctuations, energy storage (ES) also has been greatly developed with the increase of renewable capacity. To this end, the capacity planning of renewables and ESs has drawn much attention and many methods have been proposed. In the formulations of capacity planning problems, more detailed and complicated operation constraints mean more accurate planning results, which is the consensus of many researchers. However, to guarantee the problem formulation tractable, the actual multistage operation process of power system is not properly considered in existing planning methods. Therefore, in this paper, a new capacity expansion planning method for wind power and ESs is proposed considering the actual multistage operation process of power system. Specially, the hourly robust transmission constrained unit commitment (TCUC) and economic dispatch (ED) are involved in this planning method and thus, it could accurately evaluate the operational cost under certain planning decision. Besides, to guarantee the solvability and computational efficiency of planning method, a parallel horizon-splitting method is improved to solve the long-time-horizon hourly robust TCUC problem, and a genetic algorithm nested gradient descent method is established to accelerate the solving of planning problem. With the actual multistage operation process, a more reasonable expansion planning decision is obtained and the computational efficiency is greatly improved by the proposed acceleration algorithm. Numerical tests verify the efficacy of proposed method.
引用
收藏
页数:13
相关论文
共 50 条
  • [1] Robust Transmission and Energy Storage Expansion Planning in Wind Farm-Integrated Power Systems Considering Transmission Switching
    Dehghan, Shahab
    Amjady, Nima
    [J]. IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2016, 7 (02) : 765 - 774
  • [2] Robust transmission expansion planning under robust network constrained-unit commitment
    El-Meligy, Mohammed A.
    Sharaf, Mohamed
    [J]. ELECTRIC POWER SYSTEMS RESEARCH, 2024, 229
  • [3] Unit commitment considering wind power and electrochemical energy storage system
    Cai Zhi
    Men Deyue
    Dong Wei
    Dai Sai
    Cui Hui
    Zhang Xiaotian
    [J]. ENERGY AND POWER TECHNOLOGY, PTS 1 AND 2, 2013, 805-806 : 387 - +
  • [4] Robust transmission constrained unit commitment under wind power uncertainty with adjustable conservatism
    Tian, Yuan
    Wu, Wei
    Wang, Keyou
    Fu, Yong
    Li, Guojie
    [J]. IET GENERATION TRANSMISSION & DISTRIBUTION, 2020, 14 (05) : 824 - 832
  • [5] Robust Static Transmission Expansion Planning Considering Contingency and Wind Power Generation
    de Paula, Arthur N.
    de Oliveira, Edimar J.
    de Oliveira, Leonardo W.
    Honorio, Leonardo M.
    [J]. JOURNAL OF CONTROL AUTOMATION AND ELECTRICAL SYSTEMS, 2020, 31 (02) : 461 - 470
  • [6] Robust Static Transmission Expansion Planning Considering Contingency and Wind Power Generation
    Arthur N. de Paula
    Edimar J. de Oliveira
    Leonardo W. de Oliveira
    Leonardo M. Honório
    [J]. Journal of Control, Automation and Electrical Systems, 2020, 31 : 461 - 470
  • [7] Transmission Expansion Planning Considering Energy Storage
    MacRae, Cameron
    Ozlen, Melih
    Ernst, Andreas
    [J]. 2014 IEEE INTERNATIONAL AUTUMN MEETING ON POWER, ELECTRONICS AND COMPUTING (ROPEC), 2014,
  • [8] Reliability-constrained dynamic transmission expansion planning considering wind power generation
    de Paula, A. N.
    de Oliveira, E. J.
    Oliveira, L. W.
    Moraes, C. A.
    [J]. ELECTRICAL ENGINEERING, 2020, 102 (04) : 2583 - 2593
  • [9] Probability constrained optimisation model for transmission expansion planning considering the curtailment of wind power
    Liu, Dundun
    Cheng, Haozhong
    Lv, Jiawei
    Fu, Yesheng
    Zhang, Jianping
    [J]. JOURNAL OF ENGINEERING-JOE, 2019, (18): : 5340 - 5344
  • [10] Reliability-constrained dynamic transmission expansion planning considering wind power generation
    A. N. de Paula
    E. J. de Oliveira
    L. W. Oliveira
    C. A. Moraes
    [J]. Electrical Engineering, 2020, 102 : 2583 - 2593