Exploring Waste Generation Mechanism for Construction Projects

被引:0
|
作者
Li, Ya-shuai [1 ]
Zhang, Xue-qing [2 ]
Zhao, Qiu-hong [1 ]
机构
[1] Beihang Univ, Sch Econ & Management, Beijing 100191, Peoples R China
[2] Hong Kong Univ Sci & Technol, Dept Civil & Environm Engn, Kowloon, Hong Kong, Peoples R China
关键词
BUILDING CONSTRUCTION; HONG-KONG; MANAGEMENT;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction waste has become a major source of municipal solid waste and thus prevented sustainable urban development. In order to address the substantial amount of construction waste, construction waste generation should be examined in detail to minimize the waste generation in construction processes and maximize the waste utilization after its generation. Based on work breakdown structure (WBS) and material flow analysis, this paper investigates the inputs and outputs of each work package, explores various functions of different materials in different work packages, identifies the material categories and finally discovers the waste generation mechanism for construction projects. This paper provides a systematic method to examine the waste generation for construction projects and could be utilized for construction waste estimation and utilization.
引用
收藏
页码:355 / 358
页数:4
相关论文
共 50 条
  • [41] STORYTELLING AS KNOWLEDGE TRANSFER MECHANISM IN CONSTRUCTION PROJECTS
    Leung, Jodith K. L.
    Fong, Patrick S. W.
    PROCEEDINGS OF THE SECOND INTERNATIONAL POSTGRADUATE CONFERENCE ON INFRASTRUCTURE AND ENVIRONMENT, VOL 1, 2010, : 353 - 360
  • [42] Responsibility mechanism for agent construction of public projects
    Zhang, Wei
    Zhu, Hongliang
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2008, 41 (12): : 103 - 107
  • [43] Generation of construction and demolition waste in Portugal
    Coelho, Andre
    de Brito, Jorge
    WASTE MANAGEMENT & RESEARCH, 2011, 29 (07) : 739 - 750
  • [44] Web-based construction waste estimation system for building construction projects
    Li, Yashuai
    Zhang, Xueqing
    AUTOMATION IN CONSTRUCTION, 2013, 35 : 142 - 156
  • [45] Proposal of a model for the quantification of construction waste costs in the planning stage of construction projects
    Garces, Gonzalo
    Molina, Antonio
    INFORMES DE LA CONSTRUCCION, 2023, 75 (751)
  • [46] Electricity Generation from Solid Waste by Pilot Projects
    Varadi, A. Sz.
    Takacs, J.
    2008 INTERNATIONAL SYMPOSIUM ON POWER ELECTRONICS, ELECTRICAL DRIVES, AUTOMATION AND MOTION, VOLS 1-3, 2008, : 826 - +
  • [47] Factors Contributing to the Waste Generation in Building Projects of Pakistan
    Memon, Nafees Ahmed
    Laghari, Muhammad Aslam
    Memon, Fareed Ahmed
    MEHRAN UNIVERSITY RESEARCH JOURNAL OF ENGINEERING AND TECHNOLOGY, 2016, 35 (01) : 95 - 100
  • [48] Evolutionary Mechanism of Government Green Development Behavior in Construction and Demolition Waste Recycling Projects: A Perspective of Ecological Compensation
    Chen, Weihong
    Yin, Wenjun
    Yi, Beiyu
    Xu, Shiqi
    Zhang, Hao
    Li, Xingwei
    BUILDINGS, 2023, 13 (07)
  • [49] Quantification Methods for Construction Waste Generation at Construction Sites: a Review
    Masudi, Ahmad Firman
    Hassan, Che Rosmani Che
    Mahmood, Noor Zalina
    Mokhtar, Siti Nazziera
    Sulaiman, Nik Meriam
    ADVANCES IN STRUCTURES, PTS 1-5, 2011, 163-167 : 4564 - +
  • [50] Effect of construction activities on construction and demolition waste generation in Iran
    Abbasianjahromi, H.
    Khoshand, A.
    Zoghi, M.
    Heydarzadeh, M. J.
    WASTE MANAGEMENT, 2017, 70 : II - III