Integrated Production Planning and Preventive Maintenance Model with Non-fixed Lead Time

被引:0
|
作者
Huang, Jianqiu [1 ]
Wang, Liya [1 ]
机构
[1] Shanghai Jiao Tong Univ, Dept Ind Engn & Management, Shanghai, Peoples R China
基金
中国国家自然科学基金;
关键词
Production planning; Preventive maintenance; Clearing function; lead time; CLEARING FUNCTIONS;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
Non-fixed lead time in production planning is a challenge issue especially in high utilization systems such as semiconductor wafer manufacturing system. Also, the mutual influence between production planning and preventive maintenance should be integrated to achieve overall optimization. In this paper, preventive maintenance's influence on production planning is considered based on the existing non-fixed lead time clearing function. An integrated production planning and preventive maintenance model is built to reflect the mutual influence between production planning and preventive maintenance. Experiments are conducted by simulation under different production line complexity and facility degradation levels. As a result, the superiority of the integrated model is demonstrated compared to two existing production planning models.
引用
收藏
页码:1653 / 1658
页数:6
相关论文
共 50 条
  • [21] Production and maintenance integrated planning
    Brandolese, M
    Franci, M
    Pozzetti, A
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1996, 34 (07) : 2059 - 2075
  • [22] A mixed-integer programming model for an integrated production planning problem with preventive maintenance in the pulp and paper industry
    Aviles, Francisco N.
    Etchepare, Renato Maynard
    Aguayo, Maichel M.
    Valenzuela, Mario
    [J]. ENGINEERING OPTIMIZATION, 2023, 55 (08) : 1352 - 1369
  • [23] Integrated production and quality model under various preventive maintenance policies
    Ben-Daya, M
    Makhdoum, M
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1998, 49 (08) : 840 - 853
  • [24] Preventive maintenance and silica exposure limits integrated in the production planning of a granite processing unit
    Tambah, Kevin Gildas Dongmo
    Kenne, Jean-Pierre
    Songmene, Victor
    [J]. JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2023, 29 (01) : 1 - 26
  • [25] Exploring process variance in assembly planning with non-fixed simulation parameters
    Auris, Felix
    Gaisbauer, Felix
    Baer, Thomas
    [J]. 52ND CIRP CONFERENCE ON MANUFACTURING SYSTEMS (CMS), 2019, 81 : 1213 - 1218
  • [26] \Integrated maintenance and production planning: a model to include rescheduling costs
    Portioli-Staudacher, Alberto
    Tantardini, Marco
    [J]. JOURNAL OF QUALITY IN MAINTENANCE ENGINEERING, 2012, 18 (01) : 42 - +
  • [27] An integrated production, inventory and preventive maintenance model for a multi-product production system
    Liu, Xuejuan
    Wang, Wenbin
    Peng, Rui
    [J]. RELIABILITY ENGINEERING & SYSTEM SAFETY, 2015, 137 : 76 - 86
  • [28] A geostatistical spatio-temporal model to non-fixed locations
    V. F. Sehaber
    W. H. Bonat
    P. J. Diggle
    P. J. Ribeiro
    [J]. Stochastic Environmental Research and Risk Assessment, 2021, 35 : 165 - 182
  • [29] A geostatistical spatio-temporal model to non-fixed locations
    Sehaber, V. F.
    Bonat, W. H.
    Diggle, P. J.
    Ribeiro, P. J., Jr.
    [J]. STOCHASTIC ENVIRONMENTAL RESEARCH AND RISK ASSESSMENT, 2021, 35 (02) : 165 - 182
  • [30] A production model with imperfect preventive maintenance
    Wang, Chih-Hsiung
    [J]. JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2005, 8 (03): : 601 - 613