Optimal sequential inspection

被引:0
|
作者
Pachter, Meir [1 ]
Chandler, Phillip R. [2 ]
Darbha, Swaroop [2 ,3 ]
机构
[1] USAF, Inst Technol, AFIT ENG, 2950 Hobson Way,Bldg 640, Wright Patterson AFB, OH 45433 USA
[2] Air Force Res Lab, Wright Patterson AFB, OH 45433 USA
[3] Texas A&M Univ, Dept Engn Mech, College Stn, TX 77843 USA
关键词
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In this paper, we consider a problem of sequential resource allocation. Such a problem arises in a simplified Intelligence, Surveillance and Reconnaissance (ISR) scenario where a Micro Air Vehicle (MAV) is tasked with search and classification in an environment with false targets. The MAV visits the objects of interest in a specified sequence for classification. A human operator aids classification of objects based on the images sent to him from the MAV and the operator may request that the object be revisited if he requires further information. Such a request is made at most once by the operator for each object. The information gained by the operator when any object is revisited is the same. There is a random delay in communicating his findings to the MAV and the probability density function of the delay is assumed known. The MAV has a finite fuel reserve and upon receiving the feedback from the operator, it must decide whether to revisit the object or whether to continue to the next object in the sequence. In every revisit, fuel is expended from the reserve and equals twice the delay plus a fixed fuel cost. The objective is to maximize the number of revisits so as to maximize the information gained about the objects, which enables them to be classified as targets or false targets. Using Stochastic Dynamic Programming, we show that there is a threshold delay for each object and it is optimal to revisit the object if the operator delay is smaller than the threshold and not to revisit otherwise.
引用
收藏
页码:5934 / 5934
页数:1
相关论文
共 50 条
  • [41] Group sequential monitoring with arbitrary inspection times
    Wassmer, G
    BIOMETRICAL JOURNAL, 1999, 41 (02) : 197 - 216
  • [42] A sequential Stackelberg game for dynamic inspection problems
    Guzman, Cristobal
    Riffo, Javiera
    Telha, Claudio
    Van Vyve, Mathieu
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2022, 302 (02) : 727 - 739
  • [43] Optimal sequential inspection of reliability systems subject to parallel-chain with single direction and single cross precedence constraints
    Li, Yue
    Cui, Li-Rong
    Xi Tong Gong Cheng Yu Dian Zi Ji Shu/Systems Engineering and Electronics, 2007, 29 (02): : 324 - 328
  • [44] The effects of inspection delay and restoration cost on the optimal inspection and production policy
    Tsai W.C.
    Shih N.-H.
    Wang C.-H.
    OPSEARCH, 2018, 55 (1) : 187 - 195
  • [45] Investigation of the effect of the quality of inspection techniques on the optimal inspection interval for structures
    Sheils, E.
    O'Connor, A.
    Schoefs, F.
    Breysse, D.
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2012, 8 (06) : 557 - 568
  • [46] An Optimal Inspection Policy for a Standby System under Limited Inspection Opportunities
    Si Xiaosheng
    Zhang Qi
    Li Tianmei
    Li Juan
    2015 34TH CHINESE CONTROL CONFERENCE (CCC), 2015, : 6386 - 6391
  • [47] Optimal inspection strategy for a standby unit based on finite inspection opportunities
    Feng, Lei
    Wang, Hongli
    Si, Xiaosheng
    Zhou, Zhijie
    Lu, Jinghui
    Yi Qi Yi Biao Xue Bao/Chinese Journal of Scientific Instrument, 2012, 33 (12): : 2667 - 2673
  • [48] Optimal random and periodic inspection policies
    Sugiura, T
    Mizutani, S
    Nakagawa, T
    NINTH ISSAT INTERNATIONAL CONFERENCE ON RELIABILITY AND QUALITY IN DESIGN, 2003 PROCEEDINGS, 2003, : 42 - 45
  • [49] Optimal inspection sequence in fault diagnosis
    Xiaozhong, Wang
    Cooke, Roger M.
    Reliability Engineering and System Safety, 1992, 37 (03): : 207 - 210
  • [50] OPTIMAL INSPECTION POLICIES - A REVIEW AND COMPARISON
    KAIO, N
    OSAKI, S
    JOURNAL OF MATHEMATICAL ANALYSIS AND APPLICATIONS, 1986, 119 (1-2) : 3 - 20