DEVELOPING FRAMEWORK FOR SAFETY ANALYSIS AND RISK ASSESSMENT IN CONSTRUCTION SITE ENVIRONMENT IN JORDAN

被引:0
|
作者
Alnhoud, Omar Toheeteh [1 ]
Shaqadan, Ashraf [2 ]
Alkasasbeh, Riad [3 ]
机构
[1] Al Bayt Univ, Dept Civil Engn, Fac Engn, Mafraq 25113, Jordan
[2] Zarqa Univ, Zarqa, Jordan
[3] Al Balqa Appl Univ, Fac Engn Technol, Amman, Salt, Jordan
关键词
construction site; safety analysis; risk matrix; severity index; injuries; T-score; TRIR; MANAGEMENT;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction projects involve many types of health and injury risks across life of project. A safety plan needs to be designed based on different stages of construction and requires specific needs for each risk type. The core to the successful safety plan is having comprehensive assessment of risk sources and mitigation actions. A great majority of construction SMEs (Small and Medium Enterprises) are not familiar with risk assessment concepts and methods. Many small and medium construction businesses have difficulty in finding qualified personnel or time to design a safety plan. The goal of this study is to demonstrate a case of designing a safety plan for a real construction project in Jordan. We show detailed application of conducting a work safety plan and a detailed risk assessment. The studied case presents a robust application of risk assessment in a construction project that can guide small and medium scale construction projects in building sound safety plan. Tables are prepared containing the activities and their hazards and determining the probability and severity of the risk in order to determine the level of risk, which is average (6-12), the precautionary measures and methods of control are then developed and the risk assessment is carried out again until the level of risk reaches a low and acceptable value (2-4). The discussed method is found to be user friendly, and the SMEs found it easy to update their risk strategies during various construction stages in their projects. We conclude that the hazard rate degree is 27% low, 65% medium, and 8% high. The activities have a level risk that varies from medium to high, so it is mandatory to follow the safety instructions and the monitoring and continuous inspection to reduce accidents and work injuries.
引用
收藏
页码:135 / 145
页数:11
相关论文
共 50 条
  • [41] Risk assessment of safety and health (RASH) for building construction
    Al-Anbari, Saud
    Khalina, A.
    Alnuaimi, Ali
    Normariah, A.
    Yahya, A.
    [J]. PROCESS SAFETY AND ENVIRONMENTAL PROTECTION, 2015, 94 : 149 - 158
  • [42] Safety risk assessment in construction projects at Hasanuddin University
    Darwis, A. Muflihah
    Nai'em, M. Furqaan
    Thamrin, Yahya
    Noviponiharwani
    Rahmadani, Suci
    Amin, Fauziah
    [J]. GACETA SANITARIA, 2021, 35 : S385 - S387
  • [43] A risk assessment approach for enhancing construction safety performance
    Sanni-Anibire, Muizz O.
    Mahmoud, Abubakar S.
    Hassanain, Mohammad A.
    Salami, Babatunde A.
    [J]. SAFETY SCIENCE, 2020, 121 : 15 - 29
  • [44] CONSTRUCTION SAFETY RISK ASSESSMENT WITH INTRODUCED CONTROL LEVELS
    Gunduz, Murat
    Laitinen, Heikki
    [J]. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2018, 24 (01) : 11 - 18
  • [45] Blended analysis of occupational safety hazards and digital transformation of risk assessment in construction industries
    Qiu, Changcui
    Li, Xinming
    [J]. CANADIAN JOURNAL OF CIVIL ENGINEERING, 2023, 50 (03) : 184 - 196
  • [46] Emerging Trends of Ergonomic Risk Assessment in Construction Safety Management: A Scientometric Visualization Analysis
    Vijayakumar, Rakhi
    Choi, Jae-ho
    [J]. INTERNATIONAL JOURNAL OF ENVIRONMENTAL RESEARCH AND PUBLIC HEALTH, 2022, 19 (23)
  • [47] A PROBABILISTIC RISK ASSESSMENT FRAMEWORK FOR DAM SAFETY EVALUATION
    ASANTEDUAH, DK
    [J]. PROCEEDINGS OF EIGHTH ANNUAL AGU FRONT RANGE BRANCH: HYDROLOGY DAYS, 1988, : 69 - 80
  • [48] Health, safety and environment risk assessment in gas pipelines
    Malmasi, Saeed
    Fam, Iraj Mohammad
    Mohebbi, Nahid
    [J]. JOURNAL OF SCIENTIFIC & INDUSTRIAL RESEARCH, 2010, 69 (09): : 662 - 666
  • [49] Environment, safety, and health risk assessment program (ESHRAP)
    Eide, SA
    Wierman, TE
    [J]. PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL I AND II, PROCEEDINGS, 2002, : 2043 - 2048
  • [50] Developing a Decision-Making Framework to Select Safety Technologies for Highway Construction
    Nnaji, Chukwuma
    Lee, Hyun Woo
    Karakhan, Ali
    Gambatese, John
    [J]. JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2018, 144 (04)