- [1] Direct risk factors and cost performance of road projects in developing countries: Contractors’ perspective [J]. Journal of Engineering, Design and Technology, 2020, 18 (02): : 326 - 342
- [3] Contractors Perspective for Critical Factors of Cost Overrun in Highway Projects of Sindh, Pakistan [J]. PROCEEDINGS OF THE INTERNATIONAL CONFERENCE OF GLOBAL NETWORK FOR INNOVATIVE TECHNOLOGY AND AWAM INTERNATIONAL CONFERENCE IN CIVIL ENGINEERING (IGNITE-AICCE'17): SUSTAINABLE TECHNOLOGY AND PRACTICE FOR INFRASTRUCTURE AND COMMUNITY RESILIENCE, 2017, 1892
- [4] Risk factors affecting the construction projects in the developing countries [J]. NATIONAL COLLOQUIUM ON WIND AND EARTHQUAKE ENGINEERING, 2019, 244
- [5] Research on Grading of Risk Factors in International EPC Projects from Contractors' Perspective [J]. CIVIL ENGINEERING, ARCHITECTURE AND SUSTAINABLE INFRASTRUCTURE II, PTS 1 AND 2, 2013, 438-439 : 1968 - +
- [9] Risk Management in Construction Projects in Palestine: Contractors' Perspective [J]. REVISTA INGENIERIA DE CONSTRUCCION, 2024, 39 (02): : 140 - 150
- [10] Severity of Time Overrun Causes in Road Construction Projects: Contractors' Perspective [J]. PROCEEDINGS OF 2011 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1 AND 2, 2011, : 191 - 194