Improved heuristic methods for multiple stage production planning

被引:22
|
作者
Simpson, NC [1 ]
Erenguc, SS
机构
[1] SUNY Buffalo, Sch Management, Dept Management Syst & Sci, Buffalo, NY 14260 USA
[2] Univ Florida, Coll Business, Dept Informat & Decis Sci, Gainesville, FL 32611 USA
关键词
D O I
10.1016/S0305-0548(97)00089-0
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Multiple stage production planning typifies any system in which the scheduling of some production stage may place demands on necessary predecessor stages, or constrain the schedules of successor stages. This paper considers detailed material planning, or lot sizing, in a multiple stage, dynamic demand environment. A new heuristic method for developing such production schedules is introduced, based on a structured neighborhood search approach to these problems. An efficient lower bounding technique is also presented, employing Lagrangian relaxation and an alternate approach to the mathematical formulation of a multiple stage planning problem. This technique was employed to find lower bounds on all numerical experiments. The scope of the investigation, with respect to the number of improved heuristic methods included for comparison, is among the broadest in the literature. The new heuristic performed consistently better than other methods, producing solutions which were within an average of 1% of optimal. (C) 1998 Elsevier Science Ltd. All rights reserved.
引用
收藏
页码:611 / 623
页数:13
相关论文
共 50 条
  • [21] A new heuristic and an exact approach for a production planning problem
    Peter Auer
    György Dósa
    Tibor Dulai
    Armin Fügenschuh
    Peggy Näser
    Ronald Ortner
    Ágnes Werner-Stark
    [J]. Central European Journal of Operations Research, 2021, 29 : 1079 - 1113
  • [22] A heuristic algorithm for a production planning problem in an assembly system
    Park, MW
    Kim, YD
    [J]. JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 1999, 50 (02) : 138 - 147
  • [23] Heuristic procedure for resolving a production planning model of an FMS
    Sengupta, S
    Davis, RP
    [J]. COMPUTERS & INDUSTRIAL ENGINEERING, 1996, 30 (02) : 161 - 170
  • [24] A new heuristic and an exact approach for a production planning problem
    Auer, Peter
    Dosa, Gyorgy
    Dulai, Tibor
    Fuegenschuh, Armin
    Naeser, Peggy
    Ortner, Ronald
    Werner-Stark, Agnes
    [J]. CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2021, 29 (03) : 1079 - 1113
  • [25] Improved heuristic for manpower shift planning with modified shift priorities
    Lagodimos, A. G.
    Paravantis, J. A.
    [J]. PRODUCTION PLANNING & CONTROL, 2006, 17 (03) : 301 - 310
  • [26] AN IMPROVED HEURISTIC FOR MULTILEVEL LOT SIZING IN MATERIAL REQUIREMENTS PLANNING
    COLEMAN, BJ
    MCKNEW, MA
    [J]. DECISION SCIENCES, 1991, 22 (01) : 136 - 156
  • [27] METHODS FOR INTEGRATION OF PROCESS PLANNING AND PRODUCTION PLANNING
    LARSEN, NE
    [J]. INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 1993, 6 (1-2) : 152 - 162
  • [28] Improved Heuristic Algorithm for Modern Industrial Production Scheduling
    Jiang Yongqing
    Pan Fucheng
    [J]. 2017 9TH INTERNATIONAL CONFERENCE ON MODELLING, IDENTIFICATION AND CONTROL (ICMIC 2017), 2017, : 1080 - 1084
  • [29] Improved heuristic algorithm for modern industrial production scheduling
    Jiang, Yongqing
    Pan, Fucheng
    [J]. INTERNATIONAL JOURNAL OF MODELLING IDENTIFICATION AND CONTROL, 2018, 30 (04) : 284 - 292
  • [30] MATHEMATICAL METHODS IN PRODUCTION PLANNING
    ABRAMOV, YA
    PROSKURY.AV
    [J]. RUSSIAN ENGINEERING JOURNAL-USSR, 1965, 45 (07): : 74 - &