共 50 条
- [32] Back-analysis on Initial Ground Stress of Underground Workshop Region of Shenzhen Pumped Storage Power Station PROGRESS IN CIVIL ENGINEERING, PTS 1-4, 2012, 170-173 : 1634 - 1637
- [33] Failure mechanism and mode of surrounding rock of underground powerhouse at the right bank of Wudongde hydropower station subjected to excavation Xu, Nuwen (xunuwen@scu.edu.cn), 2017, Academia Sinica (36): : 781 - 793
- [34] Study on the characteristics of microseismicity and electromagnetic radiation activity of the underground powerhouse at Huanggou pumped storage power station subjected to the excavation Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2019, 38 : 3583 - 3594
- [35] Damage analysis and deformation early warning of surrounding rock mass during top arch excavation of underground powerhouse of Shuangjiangkou hydropower station Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2019, 38 (12): : 2512 - 2524
- [36] Back analysis of initial geostress field for underground powerhouse zone of Shuangjiangkou hydropower station Tumu Gongcheng Xuebao, 8 (86-95): : 86 - 95
- [38] Analysis of the factors that affect the arrangement of powerhouse of pumped storage power station Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2009, 28 (02): : 157 - 160
- [39] Investigation on deformation and cracking behaviors and stability analysis of surrounding rock mass of underground main powerhouse of Shuangjiangkou hydropower station during preliminary excavation Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2021, 40 (03): : 520 - 532