共 50 条
- [31] Solution for non-permutation flow shop scheduling with buffers and machine availability constraints Dongbei Daxue Xuebao/Journal of Northeastern University, 2014, 35 (09): : 1329 - 1334
- [32] A new heuristic for minimizing total completion time objective in permutation flow shop scheduling The International Journal of Advanced Manufacturing Technology, 2011, 53 : 1189 - 1197
- [35] On non-permutation solutions to some two machine flow shop scheduling problems 1600, Physica-Verlag GmbH & Co, Heidelberg, Germany (40):
- [37] A composite algorithm for total completion-time minimization in large flow shop scheduling PROCEEDINGS OF 2006 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2006, : 2439 - +
- [38] Multi-Threaded Bacterial Iterated Greedy Heuristics for the Permutation Flow Shop Problem 13TH IEEE INTERNATIONAL SYMPOSIUM ON COMPUTATIONAL INTELLIGENCE AND INFORMATICS (CINTI 2012), 2012, : 63 - 66