Integrated Team Design Process - Successful Stories of Hong Kong MTR Corporation Projects

被引:7
|
作者
Ping, Chin Sai
Keung, Clement Ngai Yum [2 ]
Ramanathana, M. [1 ,3 ]
机构
[1] AECOM Asia Co Ltd, Bldg Engn, Struct, Ahmadabad, Gujarat, India
[2] MTR Corp, SCL NSL, Hong Kong, Peoples R China
[3] AECOM Asia Co Ltd, Bldg Engn, Bombay, Maharashtra, India
关键词
Integrated Design Team; Partnering; Design Stages; Relationship; Management;
D O I
10.1016/j.proeng.2011.07.149
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Achieving design quality with systematic design management is essential for any construction project. This becomes all the more important and difficult for infrastructure projects which are complex in nature and involves several disciplines and multiple stake holders. Normally, the client and the design team including the lead consultant and various specialist sub-consultants work in different places in their respective offices, which normally result in problems such as poor coordination, lack of collaboration, excessive variations, design changes, abortive reworks and unwarranted delays. MTR Corporation sets up integrated multi-disciplinary design teams using the combined resources of MTR Corporation and the consultants working together in an Integrated Team Design Process. Such integrated design team office arrangements include advanced information and communication frameworks as well as electronic project management systems. Also, MTR Corporation through integrated team design develops the design in stages, namely feasibility study, preliminary design and detailed design; thus repeatedly reviewing and improving the design exhausts all possible options and the best and practical design emerges out. This paper also presents some case-study based success stories of effective project management with such integrated design team process from recent MTR projects. (C) 2011 Published by Elsevier Ltd.
引用
收藏
页码:1190 / 1196
页数:7
相关论文
共 30 条
  • [1] Hong Kong MTR corporation airport railway
    Black, RJ
    [J]. BIG DIGS AROUND THE WORLD, 1998, (86): : 1 - 24
  • [2] Recent projects of building integrated photovoltaic in Hong Kong
    Lo, Edward W. C.
    [J]. 2006 2nd International Conference on Power Electronics Systems and Applications, 2006, : 63 - 68
  • [3] Critical policy drivers for Modular integrated Construction projects in Hong Kong
    Jin, Xin
    Ekanayake, E. M. A. C.
    Shen, Geoffrey Q. P.
    [J]. JOURNAL OF PLANNING LITERATURE, 2022, 37 (03) : 537 - 537
  • [4] Critical policy drivers for Modular integrated Construction projects in Hong Kong
    Jin, Xin
    Ekanayake, E. M. A. C.
    Shen, Geoffrey Q. P.
    [J]. BUILDING RESEARCH AND INFORMATION, 2022, 50 (04): : 467 - 484
  • [5] Hong Kong team wins power-supply-design contest
    Manjunath, N
    [J]. EDN, 2005, 50 (15) : 26 - 26
  • [6] A New Approach for the Successful Team Building in VLSI Design Projects
    Barzdenas, Vaidotas
    Grazulevicius, Gediminas
    Vasjanov, Aleksandr
    [J]. INTERNATIONAL JOURNAL OF ENGINEERING EDUCATION, 2017, 33 (05) : 1618 - 1626
  • [7] Modeling relational transaction and relationship quality among team members in public projects in Hong Kong
    Ling, Florence Y. Y.
    Ning, Yan
    Ke, Yongjian
    Kumaraswamy, Mohan M.
    [J]. AUTOMATION IN CONSTRUCTION, 2013, 36 : 16 - 24
  • [8] Contribution of Urban Design to Economic Sustainability of Urban Renewal Projects in Hong Kong
    Chan, Edwin H. W.
    Lee, Grace K. L.
    [J]. SUSTAINABLE DEVELOPMENT, 2008, 16 (06) : 353 - 364
  • [9] Management of client requirements for design and build projects in the construction industry of Hong Kong
    Yu, Ann
    Chan, Edwin
    Chan, Daniel
    Lam, Patrick
    Tang, Peony
    [J]. FACILITIES, 2010, 28 (13-14) : 657 - 672
  • [10] Integrated Design Process: Planning and Team Engagement
    Pope, Stephen
    Tardif, Michel
    [J]. ASHRAE TRANSACTIONS 2011, VOL 117, PT 2, 2011, 117 : 433 - 440