Recent projects of building integrated photovoltaic in Hong Kong

被引:0
|
作者
Lo, Edward W. C. [1 ]
机构
[1] Hong Kong Polytech Univ, Dept Elect Engn, Hong Kong, Hong Kong, Peoples R China
关键词
renewable energy; solar energy; photovoltaic; BIPV; grid-connection;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In Hong Kong, a number of medium-scale Building Integrated Photovoltaic (BIPV) systems were completed in last few years. These BIPV projects included government building, commercial building, schools, institutional building. The power rating the BIPV system for each project is in the order of tens of kilowatts. Most of these BIPV systems are gird-connected type to eliminate the bulky and troublesome battery banks. Some of these projects are retrofitting on existing buildings; while some are parts of a new building. The paper will give details on the design of these PV systems in Hong Kong, including system configurations, design considerations, protections, grid-connection interfacing, power quality issues, their performance, technical difficulties encountered, and experience gained.
引用
收藏
页码:63 / 68
页数:6
相关论文
共 50 条
  • [1] Building-integrated photovoltaic application - Its practice in Hong Kong
    Yang, H
    Fung, Y
    PROCEEDINGS OF 3RD WORLD CONFERENCE ON PHOTOVOLTAIC ENERGY CONVERSION, VOLS A-C, 2003, : 2490 - 2493
  • [2] A Study of Incentive Policies for Building-Integrated Photovoltaic Technology in Hong Kong
    Song, Aotian
    Lu, Lin
    Liu, Zhizhao
    Wong, Man Sing
    SUSTAINABILITY, 2016, 8 (08):
  • [3] Building-integrated heat pipe photovoltaic/thermal system for use in Hong Kong
    Hui, Long
    Tin-Tai, Chow
    Jie, Ji
    SOLAR ENERGY, 2017, 155 : 1084 - 1091
  • [4] Safety cost optimization of building projects in Hong Kong
    Tang, S.L.
    Lee, H.K.
    Wong, K.
    Construction Management and Economics, 1997, 15 (02) : 177 - 186
  • [5] Supply Chain Management for Prefabricated Building Projects in Hong Kong
    Luo, Lizi
    Jin, Xin
    Shen, Geoffrey Qiping
    Wang, Yingjie
    Liang, Xin
    Li, Xiao
    Li, Clyde Zhengdao
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2020, 36 (02)
  • [6] A review on the execution method for building information modelling projects in Hong Kong
    Wong, Stella S. Y.
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-MANAGEMENT PROCUREMENT AND LAW, 2018, 171 (03) : 100 - 110
  • [7] Critical policy drivers for Modular integrated Construction projects in Hong Kong
    Jin, Xin
    Ekanayake, E. M. A. C.
    Shen, Geoffrey Q. P.
    JOURNAL OF PLANNING LITERATURE, 2022, 37 (03) : 537 - 537
  • [8] Critical policy drivers for Modular integrated Construction projects in Hong Kong
    Jin, Xin
    Ekanayake, E. M. A. C.
    Shen, Geoffrey Q. P.
    BUILDING RESEARCH AND INFORMATION, 2022, 50 (04): : 467 - 484
  • [9] Environmental payback time analysis of a roof-mounted building-integrated photovoltaic (BIPV) system in Hong Kong
    Lu, L.
    Yang, H. X.
    APPLIED ENERGY, 2010, 87 (12) : 3625 - 3631
  • [10] Compressing construction durations: Lessons learned from Hong Kong building projects
    Chan, D.W.M.
    Kumaraswamy, M.M.
    International Journal of Project Management, 2002, 20 (01) : 23 - 35