Project appraisal and selection using the analytic network process

被引:23
|
作者
Dikmen, Irem [1 ]
Birgonul, M. Talat [1 ]
Ozorhon, Beliz [1 ]
机构
[1] Middle E Tech Univ, Dept Civil Engn, TR-06531 Ankara, Turkey
关键词
analytic network process (ANP); multi-criteria decision making; project selection; benefit-cost analysis;
D O I
10.1139/L07-006
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Where prioritization and selection process of large-scale construction projects is concerned, governments should consider various quantitative and qualitative criteria when choosing the best project alternative. The traditional benefit-cost (B/C) analysis has some drawbacks in terms of analyzing qualitative attributes that cannot be easily expressed in monetary terms. To eliminate this limitation, multicriteria decision-making techniques are proposed for the solution of project prioritization problems. In this paper, ail analytic network process (ANP) model is developed to demonstrate how the project selection process can be carried out by considering both quantitative and qualitative factors, as well as their interrelations. The decision network is grouped under four subnetworks, namely benefits. costs, opportunities, and risks. The selected alternatives are real highway projects that are in the investment agenda of the Turkish government. Using the proposed network model, four investment alternatives are assessed by a team of experts and achieved results demonstrate that the ranking of project alternatives may significantly change when the ANP model is used instead of the classical B/C approach.
引用
收藏
页码:786 / 792
页数:7
相关论文
共 50 条
  • [21] A hybrid quality function deployment and cybernetic analytic network process model for project manager selection
    Mohammadi, Farahbod
    Sadi, Mohammadali Kazerooni
    Nateghi, Fatemeh
    Abdullah, Arham
    Skitmore, Martin
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014, 20 (06) : 795 - 809
  • [22] A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process
    Smith-Perera, Aida
    Garcia-Melon, Monica
    Poveda-Bautista, Rocio
    Pastor-Ferrando, Juan-Pascual
    RENEWABLE & SUSTAINABLE ENERGY REVIEWS, 2010, 14 (06): : 1569 - 1579
  • [23] A Multicriteria Approach to Project Portfolio Selection Using Multiobjective Optimization and Analytic Hierarchy Process
    Gomede, Everton
    de Barros, Rodolfo Miranda
    PROCEEDINGS OF THE 2014 9TH IBERIAN CONFERENCE ON INFORMATION SYSTEMS AND TECHNOLOGIES (CISTI 2014), 2014,
  • [24] USING THE ANALYTIC HIERARCHY PROCESS AND GOAL PROGRAMMING FOR INFORMATION-SYSTEM PROJECT SELECTION
    SCHNIEDERJANS, MJ
    WILSON, RL
    INFORMATION & MANAGEMENT, 1991, 20 (05) : 333 - 342
  • [25] Decision Making on Project Selection in High Education Sector Using the Analytic Hierarchy Process
    Begicevic, Nina
    Divjak, Blazenka
    Hunjak, Tihomir
    PROCEEDINGS OF THE ITI 2009 31ST INTERNATIONAL CONFERENCE ON INFORMATION TECHNOLOGY INTERFACES, 2009, : 547 - 552
  • [26] Site selection for carbon dioxide geological storage using analytic network process
    Hsu, Chia-Wei
    Chen, Liang-Tung
    Hu, Allen H.
    Chang, Yu-Min
    SEPARATION AND PURIFICATION TECHNOLOGY, 2012, 94 : 146 - 153
  • [27] Selection of non-traditional machining processes using analytic network process
    Das, Shaswata
    Chakraborty, Shankar
    JOURNAL OF MANUFACTURING SYSTEMS, 2011, 30 (01) : 41 - 53
  • [28] Underground dam site selection using hydrological modelling and analytic network process
    Talebi, Ali
    Mandegar, Ali Reza
    Parvizi, Sara
    Poordara, Hadi
    Barkhordari, Jalal
    GROUNDWATER FOR SUSTAINABLE DEVELOPMENT, 2023, 23
  • [29] Selection of lean manufacturing systems using the analytic network process - a case study
    Anand, G.
    Kodali, Rambabu
    JOURNAL OF MANUFACTURING TECHNOLOGY MANAGEMENT, 2009, 20 (02) : 258 - 289
  • [30] Using Analytic Network Process in a Group Decision-Making for Supplier Selection
    Sadeghi, Mohammadreza
    Rashidzadeh, Mohammad Ali
    Soukhakian, Mohammad Ali
    INFORMATICA, 2012, 23 (04) : 621 - 643