A multi-site resource allocation strategy in computational grids

被引:0
|
作者
Yang, Chao-Tung [1 ]
Chen, Sung-Yi [1 ]
机构
[1] Tunghai Univ, High Performance Comp Lab, Dept Comp Sci & Informat Engn, Taichung 40704, Taiwan
关键词
D O I
暂无
中图分类号
TP301 [理论、方法];
学科分类号
081202 ;
摘要
This work presents a multi-site resource allocation (MSRA) strategy for grid resource broker to dispatch jobs to appropriate resources across multiple different administrative domains on a computational grid. The experimental result shows that MSRA can obtain better performance than other strategies. We use the Ganglia and NWS tools to monitor resource status and network-related information, respectively. The proposed grid resource broker provided secure, updated information about available resources and served as a link to the diverse systems available in the Grid.
引用
收藏
页码:199 / 210
页数:12
相关论文
共 50 条
  • [41] A capacity allocation and expansion model for TFT-LCD multi-site manufacturing
    Chen, Tzu-Li
    Chen, Yin-Yann
    Lu, Hao-Chun
    [J]. JOURNAL OF INTELLIGENT MANUFACTURING, 2013, 24 (04) : 847 - 872
  • [42] Capacity Allocation and Expansion for Multi-Generation & Multi-Site TFT-LCD Manufacturing
    Lin, James T.
    Chen, Tzu-Li
    Chu, Hsiao-Ching
    [J]. ICPOM2008: PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE OF PRODUCTION AND OPERATION MANAGEMENT, VOLUMES 1-3, 2008, : 1743 - 1749
  • [43] Resource Allocation and Strategy
    Maritan, Catherine A.
    Lee, Gwendolyn K.
    [J]. JOURNAL OF MANAGEMENT, 2017, 43 (08) : 2411 - 2420
  • [44] A resource brokering infrastructure for computational grids
    Al-Theneyan, A
    Mehrotra, P
    Zubair, M
    [J]. HIGH PERFORMANCE COMPUTING - HIPC 2002, PROCEEDINGS, 2002, 2552 : 463 - 473
  • [45] A new approach for the multi-site resource-constrained project scheduling problem
    Stiti, Cyrine
    Driss, Olfa Belkahla
    [J]. CENTERIS2019--INTERNATIONAL CONFERENCE ON ENTERPRISE INFORMATION SYSTEMS/PROJMAN2019--INTERNATIONAL CONFERENCE ON PROJECT MANAGEMENT/HCIST2019--INTERNATIONAL CONFERENCE ON HEALTH AND SOCIAL CARE INFORMATION SYSTEMS AND TECHNOLOGIES, 2019, 164 : 478 - 484
  • [46] Using a multi-agent system to optimise resource utilisation in multi-site manufacturing facilities
    Lim, Ming K.
    Tan, Kim
    Leung, Stephen C. H.
    [J]. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (09) : 2620 - 2638
  • [47] MULTI-SITE INTRADERMAL AND MULTI-SITE SUBCUTANEOUS RABIES VACCINATION - IMPROVED ECONOMICAL REGIMENS
    WARRELL, MJ
    SUNTHARASAMAI, P
    NICHOLSON, KG
    WARRELL, DA
    CHANTHAVANICH, P
    VIRAVAN, C
    SINHASENI, A
    PHANFUNG, R
    XUEREF, C
    VINCENTFALQUET, JC
    [J]. LANCET, 1984, 1 (8382): : 874 - 876
  • [48] Multi-agent Approach to Computational Resource Allocation in Edge Computing
    Kovtunenko, Alexey
    Timirov, Marat
    Bilyalov, Azat
    [J]. INTERNET OF THINGS, SMART SPACES, AND NEXT GENERATION NETWORKS AND SYSTEMS, NEW2AN 2019, RUSMART 2019, 2019, 11660 : 135 - 146
  • [49] Resource Allocation with Multi-Unit Items: Representation and Computational Results
    Dang Nguyen Le
    Ngoc-Khuong Nguyen
    Trung Thanh Nguyen
    [J]. 2017 4TH NAFOSTED CONFERENCE ON INFORMATION AND COMPUTER SCIENCE (NICS), 2017, : 60 - 65
  • [50] Multi-agent interaction for optimal resource allocation in computational grid
    Li, CL
    Lu, ZD
    Li, LY
    [J]. PROCEEDINGS OF THE 2004 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-7, 2004, : 31 - 36