共 50 条
- [42] THE OPERATION OF THE WATER MAKE UP SYSTEM OF NUCLEAR-POWER-PLANT AT PAKS ENERGIA ES ATOMTECHNIKA, 1985, 38 (7-9): : 361 - 365
- [45] STUDIES ON KINETICS OF WATER-STEAM SECONDARY SYSTEM OF A NUCLEAR POWER PLANT ATOMPRAXIS, 1970, 16 (04): : 269 - &
- [46] COOLING WATER SYSTEM CONTRACT AND CONSTRUCTION FOR THE SEABROOK NUCLEAR POWER PLANT. Underground Space, 1984, 8 (5-6): : 341 - 344
- [47] An analysis of problems arising during operation of the Perm district power plant 800-MW power unit at sliding pressure Therm. Eng., 9 (615-620): : 615 - 620
- [48] Assessing the factors affecting the water chemistry parameters in the auxiliary water system of a nuclear power plant SN Applied Sciences, 2020, 2
- [49] Assessing the factors affecting the water chemistry parameters in the auxiliary water system of a nuclear power plant SN APPLIED SCIENCES, 2020, 2 (11):
- [50] Sensitivity Analysis for Cold End System Optimization of a Nuclear Power Plant PROCEEDINGS OF THE 20TH PACIFIC BASIN NUCLEAR CONFERENCE, VOL 1, 2017, : 911 - 922