共 50 条
- [31] A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 41 (11-12): : 1227 - 1239
- [32] A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem International Journal of Advanced Manufacturing Technology, 2009, 41 (11-12): : 1227 - 1239
- [33] A novel hybrid multi-objective shuffled frog-leaping algorithm for a bi-criteria permutation flow shop scheduling problem The International Journal of Advanced Manufacturing Technology, 2009, 41 : 1227 - 1239
- [35] A discrete invasive weed optimization algorithm for the integrated lot-streaming flow shop scheduling problem Kongzhi Lilun Yu Yingyong/Control Theory and Applications, 2015, 32 (02): : 246 - 250
- [36] Shuffled Frog-leaping Algorithm Based Batch Scheduling in Semiconductor Furnace 2014 11TH WORLD CONGRESS ON INTELLIGENT CONTROL AND AUTOMATION (WCICA), 2014, : 2717 - 2722
- [38] Application of shuffled frog-leaping algorithm on clustering The International Journal of Advanced Manufacturing Technology, 2009, 45 : 199 - 209
- [39] A Least Random Shuffled Frog-Leaping Algorithm FOUNDATIONS OF INTELLIGENT SYSTEMS (ISKE 2013), 2014, 277 : 417 - 425
- [40] Application of shuffled frog-leaping algorithm on clustering INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 45 (1-2): : 199 - 209