Risk-Based UAV Corridor Capacity Analysis above a Populated Area

被引:12
|
作者
Kim, Younsil [1 ]
Bae, Joongwon [1 ]
机构
[1] Korea Aerosp Res Inst, UAS Res Div, Daejeon 34133, South Korea
关键词
UAV corridor; capacity; ground risk; Reich collision risk model; failure rate; 3RD-PARTY RISK; SEPARATION; MANAGEMENT;
D O I
10.3390/drones6090221
中图分类号
TP7 [遥感技术];
学科分类号
081102 ; 0816 ; 081602 ; 083002 ; 1404 ;
摘要
To integrate unmanned aerial vehicles (UAVs) into the national airspace in a safe manner, a risk-based approach to the regulation of UAVs is adopted in many countries. Thus, the capacity to permit UAVs in urban airspace also needs to be evaluated in a risk-based sense. In this regard, this paper proposes a methodology to analyze the capacity of UAV corridors on the basis of third-party risk on the ground. By linking the collision rate of the corridor and the failure rates of UAVs with the number of fatalities on the ground, the capacity of the UAV corridor is derived to satisfy the target level of safety. To model the collision rate of UAVs in the corridor, the Reich collision risk model is utilized. Moreover, a ground risk map is generated to compute the third-party risk on the ground using the databases for Seoul, Korea. The results show that the failure rate of UAVs is the dominant factor for determining the capacity of the corridor, even if the number of corridors increases. The proposed methodology could be useful to manage the number of flights for applications where the UAV corridor is fixed and flight continues, such as package delivery.
引用
收藏
页数:23
相关论文
共 50 条
  • [21] A new methodology for risk-based availability analysis
    Khan, Faisal I.
    Haddara, Mahmoud
    KrIshnasamy, Loganathan
    IEEE TRANSACTIONS ON RELIABILITY, 2008, 57 (01) : 103 - 112
  • [22] Risk-based analysis of squeeze cementing operations
    Izadi, M.
    Trudel, E.
    Frigaard, I. A.
    GEOENERGY SCIENCE AND ENGINEERING, 2024, 234
  • [23] Cost analysis of risk-based corrective action
    Davis, KL
    Kiernan, C
    Reed, GD
    IN SITU AND ON-SITE BIOREMEDIATION, VOL 4, 1997, 4(4) (04): : 317 - 321
  • [24] Grid-based individual risk calculation in the classification of hazardous area with a risk-based approach
    Zohdirad, H.
    Ebadi, T.
    Givehchi, S.
    Meysami, H.
    JOURNAL OF LOSS PREVENTION IN THE PROCESS INDUSTRIES, 2016, 43 : 98 - 105
  • [25] Risk-based Analysis of Business Process Executions
    Alizadeh, Mandi
    Zannone, Nicola
    CODASPY'16: PROCEEDINGS OF THE SIXTH ACM CONFERENCE ON DATA AND APPLICATION SECURITY AND PRIVACY, 2016, : 130 - 132
  • [26] Risk-based planning analysis for a single levee
    Hui, Rui
    Jachens, Elizabeth
    Lund, Jay
    WATER RESOURCES RESEARCH, 2016, 52 (04) : 2513 - 2528
  • [27] ROGA - A New Method for Risk-Based Hazard Analysis: Part 1 - Deductive Hazard Analysis and Risk-Based Assessment by Using a Risk Graph
    Bock, Franz-Josef
    Haferkamp, Klaus
    CHEMIE INGENIEUR TECHNIK, 2015, 87 (1-2) : 95 - 102
  • [28] Applicability of risk-based management and the need for risk-based economic decision analysis at hazardous waste contaminated sites
    Khadam, I
    Kaluarachchi, JJ
    ENVIRONMENT INTERNATIONAL, 2003, 29 (04) : 503 - 519
  • [29] Risk communication in risk-based planning: a practice in coastal area of Subang regency, Indonesia
    Soejarwo, Permana Ari
    Fahmi, Fikri Zul
    Suroso, Djoko Santoso Abi
    DISASTER PREVENTION AND MANAGEMENT, 2025,
  • [30] Management of groundwater in farmed pond area using risk-based regulation
    Jun-Ying Huang
    Chiao-Miao Liao
    Kao-Hung Lin
    Cheng-Haw Lee
    Environmental Monitoring and Assessment, 2014, 186 : 5763 - 5775