Large Diameter Tunnel, to Expedite Consent Decree Pipeline

被引:0
|
作者
Farnsworth, Jeff [1 ]
Bennett, David [2 ]
机构
[1] Kimley Horn & Associates Inc, 601 Northwest Loop 410,Suite 350, San Antonio, TX 78216 USA
[2] Freese & Nichols Inc, 9601 McAllister Fwy,Suite 1008, San Antonio, TX 78216 USA
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The San Antonio metropolitan area has experienced sustained growth for decades, putting increased pressure on existing wastewater infrastructure. In June 2013, the San Antonio Water System (SAWS) approved a settlement agreement with the U.S. Environmental Protection Agency (EPA) that requires significant improvements to the SAWS wastewater system over a 10-year period to reduce sanitary sewer overflows (SSOs). This work includes the targeted replacement and rehabilitation of an aging infrastructure system that consists of over 5,200 miles of sewer pipe. One such pipeline is an existing 48-inch concrete trunk sewer which currently operates at capacity during dry periods and during periods of minimal rain, routinely experiences SSOs of 50,000 to 100,000 gallons or more. SAWS has identified the replacement of this critical sewer as one of its highest priorities, initiating design of a six-mile segment of 60- to 78-inch sewer to increase the current capacity. As a key component of the EPA consent order, this project was time-critical. Numerous challenges existed along this six-mile alignment, each of which had significant potential schedule impacts: narrow corridor through U.S. Military installation for over a mile; pipeline depths between 30 and 40 feet; construction under two Department of Transportation roadways and a municipal overpass; and alignment adjacent to a major waterway (Salado Creek) where historic artifacts, flood plain, and tree coverage were likely to require mitigation. In one example, a 4,000-foot tunnel was designed, over 30-feet deep, in a 25-foot easement, that was installed between transmission and distribution power lines, on a U.S. Military installation. This 94 1/2 -inch tunnel was installed via micro-tunneling, for a 78-inch fiberglass reinforced pipe (FRP) sewer carrier pipe. This paper will focus on four tunnels such as the tunnel mentioned above, each of which was designed and installed in locations that would eliminate the need for mitigation. In each location, special considerations were incorporated into the tunnel design related to depths, soil strata, reduction of time limiting impacts, and reduction of SSOs.
引用
收藏
页码:546 / 554
页数:9
相关论文
共 50 条
  • [1] Sewer Superhighway: Fast Track for Large Diameter Consent Decree Pipeline
    Farnsworth, Jeff
    Bennett, David
    PIPELINES 2017: CONDITION ASSESSMENT, SURVEYING, AND GEOMATICS, 2017, : 48 - 57
  • [2] Study on Settlement Influence of Newly Excavated Tunnel Undercrossing Large Diameter Pipeline
    Xu, Qian
    Zhang, Wenchao
    Chen, Cheng
    Lu, Jun
    Tang, Peng
    ADVANCES IN CIVIL ENGINEERING, 2022, 2022
  • [3] Large-Diameter Tunnel Challenges during the Integrated Pipeline (IPL) Project
    Shirk, Jonathan D.
    PIPELINES 2016 - OUT OF SIGHT, OUT OF MIND, NOT OUT OF RISK, 2016, : 904 - 912
  • [4] THE PACKER CONSENT DECREE
    不详
    YALE LAW JOURNAL, 1932, 42 (01): : 81 - 94
  • [5] THE PACKERS' CONSENT DECREE
    Fewster, J. Donald
    HARVARD BUSINESS REVIEW, 1930, 8 (03) : 346 - 353
  • [6] FORMULA FOR A CONSENT DECREE
    RUBIN, S
    DATAMATION, 1976, 22 (09): : 235 - 237
  • [7] Large Diameter Pipeline Safety in Design
    Lundeen, Wendy
    Crews, Greg
    Garcia, Cynthia
    PIPELINES 2020: PLANNING AND DESIGN, 2020, : 203 - 211
  • [8] Consent Decree Calls On New York City to Cover Large Reservoir
    Landers, Jay
    CIVIL ENGINEERING, 2019, 89 (06): : 37 - 39
  • [9] EPA Consent Decree Implementation
    Sexton, Jeffrey A.
    ADVANCES IN FLUID CATALYTIC CRACKING: TESTING, CHARACTERIZATION, AND ENVIRONMENTAL REGULATIONS, 2010, 129 : 257 - 270
  • [10] AT-AND-T AND THE CONSENT DECREE
    BROWN, CL
    TELECOMMUNICATIONS POLICY, 1983, 7 (02) : 91 - 95