Flood Control Capacity of the Three Gorges Project for Different Frequency Floods

被引:11
|
作者
Yan, Qiming [1 ]
Jing, Zhu [1 ]
Xia, Zhongxi [2 ]
Zhang, Shanghong [1 ]
机构
[1] North China Elect Power Univ, Sch Water Resources & Hydropower Engn, Beijing 102206, Peoples R China
[2] Power China Chengdu Engn Corp Ltd, Chengdu, Peoples R China
基金
中国国家自然科学基金;
关键词
catastrophic flood; flood control capacity; flood control scheduling; Jingjiang flood diversion area; Three Gorges Reservoir; DONGTING LAKE; DIVERSION; RESERVOIR; CHINA;
D O I
10.1089/ees.2021.0003
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
An accurate assessment of flood control capacity of a reservoir is a prerequisite for ensuring the safety of flood control works. This study used the method of adding side reservoirs and used MIKE11 to establish a one-dimensional hydrodynamic model of the Three Gorges Reservoir (TGR). Based on the combination of the dynamic reservoir capacity flood control and the separation of the outflow of the Jingjiang Three Outlets, the flood control capacity of the TGR was assessed. The results showed that the TGR can effectively withstand large floods below the magnitude of 100-year return period discharge. For a rare flood event in 1,000 years recurrence interval, it is necessary to use the Jingjiang flood diversion area for ensuring the safety of downstream floodplains along the main river course. As far as exceptionally large floods with the return frequency of 0.01% or lager magnitude concerned, this extreme high flow cannot be safely impounded by the TGR even if the Jingjiang flood diversion area is adopted. Therefore, a series of upstream cascade reservoirs are suggested to be fully utilized for a joint flood control strategy.
引用
收藏
页码:1195 / 1205
页数:11
相关论文
共 50 条
  • [21] More floods with flood control
    Dogra, B
    ECONOMIC AND POLITICAL WEEKLY, 1997, 32 (18) : 933 - 934
  • [22] Channel Degradation Downstream from the Three Gorges Project and Its Impacts on Flood Level
    Li, Yitian
    Sun, Zhaohua
    Liu, Yun
    Deng, Jinyun
    JOURNAL OF HYDRAULIC ENGINEERING, 2009, 135 (09) : 718 - 728
  • [23] Overview on hydraulic design of the flood-release deep outlets of Three Gorges project
    Zhou, Chi
    He, Yong
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2010, 29 (02): : 31 - 35
  • [24] Flood management selections for the Yangtze River midstream after the Three Gorges Project operation
    Fang, Hongwei
    Han, Dong
    He, Guojian
    Chen, Minghong
    JOURNAL OF HYDROLOGY, 2012, 432 : 1 - 11
  • [25] Preliminary study on optimization of the regulation of flood controlled water level of three gorges project
    State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China
    Shuili Fadian Xuebao, 2008, 4 (1-6):
  • [26] Analysis on seepage control in dam foundation of the Three Gorges Project
    Zhou, Zhifang
    Teng, Jianren
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2001, 20 (05): : 700 - 704
  • [27] An insight into flood frequency for design floods
    Mohssen, M.
    FLOOD RECOVERY, INNOVATION AND RESPONSE, 2008, 118 : 155 - 164
  • [28] Resettlement in the Three Gorges Project
    Jun, Jing
    CHINA JOURNAL, 2008, 60 : 197 - 199
  • [29] Resettlement in the Three Gorges Project
    Mathur, Hari Mohan
    CHINA REPORT, 2009, 45 (04) : 374 - 377
  • [30] Magnificent Three Gorges Project
    Zhao Wen
    China's Foreign Trade, 1994, (02) : 24 - 24