Flood Control Capacity of the Three Gorges Project for Different Frequency Floods

被引:11
|
作者
Yan, Qiming [1 ]
Jing, Zhu [1 ]
Xia, Zhongxi [2 ]
Zhang, Shanghong [1 ]
机构
[1] North China Elect Power Univ, Sch Water Resources & Hydropower Engn, Beijing 102206, Peoples R China
[2] Power China Chengdu Engn Corp Ltd, Chengdu, Peoples R China
基金
中国国家自然科学基金;
关键词
catastrophic flood; flood control capacity; flood control scheduling; Jingjiang flood diversion area; Three Gorges Reservoir; DONGTING LAKE; DIVERSION; RESERVOIR; CHINA;
D O I
10.1089/ees.2021.0003
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
An accurate assessment of flood control capacity of a reservoir is a prerequisite for ensuring the safety of flood control works. This study used the method of adding side reservoirs and used MIKE11 to establish a one-dimensional hydrodynamic model of the Three Gorges Reservoir (TGR). Based on the combination of the dynamic reservoir capacity flood control and the separation of the outflow of the Jingjiang Three Outlets, the flood control capacity of the TGR was assessed. The results showed that the TGR can effectively withstand large floods below the magnitude of 100-year return period discharge. For a rare flood event in 1,000 years recurrence interval, it is necessary to use the Jingjiang flood diversion area for ensuring the safety of downstream floodplains along the main river course. As far as exceptionally large floods with the return frequency of 0.01% or lager magnitude concerned, this extreme high flow cannot be safely impounded by the TGR even if the Jingjiang flood diversion area is adopted. Therefore, a series of upstream cascade reservoirs are suggested to be fully utilized for a joint flood control strategy.
引用
收藏
页码:1195 / 1205
页数:11
相关论文
共 50 条
  • [1] The flood control and regulation of Three Gorges Project
    Cai Qihua (Changjiang Water Resources Commission
    EngineeringSciences, 2011, 9 (03) : 15 - 21
  • [2] Optimized operation scheme for reducing deposition and enhancing flood control capacity of the Three Gorges project reservoir
    Zhou, Jianjun
    Lin, Bingnan
    Zhang, Ren
    Shuili Xuebao/Journal of Hydraulic Engineering, 2000, (10): : 1 - 11
  • [3] Three Gorges Project Withstanding 2010 Peak Floods
    王儒述
    三峡论坛(三峡文学理论版)., 2010, (05) : 13 - 18
  • [4] Research on flood control planning and multiple uses regulation of Three Gorges project
    Liu, Danya
    Ji, Guoqiang
    Shuili Fadian Xuebao/Journal of Hydroelectric Engineering, 2009, 28 (06): : 19 - 25
  • [5] The dynamic capacity calculation method and the flood control ability of the Three Gorges Reservoir
    Zhang, Shanghong
    Jing, Zhu
    Yi, Yujun
    Wu, Yu
    Zhao, Yong
    JOURNAL OF HYDROLOGY, 2017, 555 : 361 - 370
  • [6] Design Flood Volume of the Three Gorges Dam Project
    Liu, De-Fu
    Xie, Bo-Tao
    Li, Hua-Jun
    JOURNAL OF HYDROLOGIC ENGINEERING, 2011, 16 (01) : 71 - 80
  • [7] Multivariable stochastic simulation of design flood in the Three Gorges project
    Xie, Botao
    Liu, Defu
    Pang, Liang
    Lu, Yijun
    PROCEEDINGS OF THE 1ST INTERNATIONAL CONFERENCE ON RISK ANALYSIS AND CRISIS RESPONSE, 2007, 2 : 527 - 532
  • [8] Effect of the Three Gorges Dam Project on flood control in the Dongting Lake area, China, in a 1998-type flood
    Hayashi, Seiji
    Murakami, Shogo
    Xu, Kai-Qin
    Watanabe, Masataka
    JOURNAL OF HYDRO-ENVIRONMENT RESEARCH, 2008, 2 (03) : 148 - 163
  • [9] Impact of the Three-Gorges Dam and water transfer project on Changjiang floods
    Nakayama, Tadanobu
    Shankman, David
    GLOBAL AND PLANETARY CHANGE, 2013, 100 : 38 - 50
  • [10] Impacts of the Three Gorges Project on flood in the middle reach of Yangtze River
    Li, Yitian
    Liu, Yun
    Sun, Zhaohua
    Deng, Jinyun
    RIVER FLOW 2006, VOLS 1 AND 2, 2006, : 2229 - +