Architecture of central control system for the 10 MW ECRH-plant at W7-X

被引:2
|
作者
Braune, H.
Brand, P.
Erckmann, V.
Jonitz, L.
Leonhardt, W.
Mellein, D.
Michel, G.
Mueller, G.
Purps, F.
Sch ller, K. -H.
Winkler, M.
机构
[1] Euratom Assoc Teilinstitut Greifswald, Max Planck Inst Plasmaphys, D-17491 Greifswald, Germany
[2] Univ Stuttgart, Inst Plasmaforsch, D-70569 Stuttgart, Germany
[3] FSK, IHM, Assoc EURATOM FZK, Forschungszentrum Karlsruhe, D-76344 Eggenstein Leopoldshafen, Germany
关键词
electron cyclotron resonance heating; central control system; w7-x;
D O I
10.1016/j.fusengdes.2007.03.023
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
Electron Cyclotron Resonance Heating (ECRH) is the main heating method for the Wendelstein 7-X stellarator (W7-X) which is presently under construction at IPP Greifswald. The mission of W7-X is to demonstrate the inherent steady state capability of stellarators at reactor relevant plasma parameters. A modular 10 MW ECRH-plant at 140 GHz with I MW CW-capability power for each module is also under construction to support the scientific objectives. The commissioning of the ECRH-plant is well under way; three gyrotrons are operational. The strict modular design allows to operate each gyrotron separately and independent from all others. The ECRH-plant consists of many devices such as gyrotrons and high voltage power supplies, superconductive magnets, collector sweep coils, gyrotron cooling systems with many water circuits and last but not least the quasi-optical transmission line for microwaves with remote controlled mirrors and further water cooled circuits. All these devices are essential for a CW operation. A steady state ECRH has specific requirements on the stellarator machine itself, on the microwave sources, transmission elements and in particular on the central control system. The quasi steady state operation (up to 30 min) asks for real time microwave power adjustment during the different segments of one stellarator discharge. Therefore, the ECRH-plant must operate with a maximum reliability and availability. A capable central control system is an important condition to achieve this goal. The central control system for the 10 MW ECRH-plant at W7-X comprises three main parts. In detail these are the voltage and current regulation of each gyrotron, the interlock system to prevent the gyrotrons from damages and the remote control system based on a hierarchy set of PLCs and computers. The architecture of this central control system is presented. (c) 2007 Elsevier B.V. All rights reserved.
引用
收藏
页码:677 / 685
页数:9
相关论文
共 50 条
  • [41] Studies towards an upgraded 1.5 MW gyrotron for W7-X
    Avramidis, Konstantinos A.
    Ruess, Tobias
    Mentgen, Felix
    Jin, Jianbo
    Wagner, Dietmar
    Gantenbein, Gerd
    Illy, Stefan
    Ioannidis, Zisis C.
    Laqua, Heinrich P.
    Pagonakis, Ioannis Gr
    Rzesnicki, Tomasz
    Thumm, Manfred
    Wolf, Robert C.
    Jelonnek, John
    20TH JOINT WORKSHOP ON ELECTRON CYCLOTRON EMISSION AND ELECTRON CYCLOTRON RESONANCE HEATING (EC20), 2019, 203
  • [42] Status of the 1 MW, CW gyrotrons for the stellarator W7-X
    Dammertz, G
    Alberti, S
    Arnold, A
    Borie, E
    Brand, P
    Braune, H
    Erckmann, V
    Gantenbein, G
    Giguet, E
    Heidinger, R
    Hogge, JP
    Illy, S
    Kasparek, W
    Koppenburg, K
    Kuntze, M
    Laqua, H
    Le Cloarec, G
    Legrand, F
    Leonhardt, W
    Lievin, C
    Magne, R
    Michel, G
    Müller, G
    Neffe, G
    Piosczyk, B
    Schmid, M
    Thumm, M
    Tran, MQ
    CONFERENCE DIGEST OF THE 2004 JOINT 29TH INTERNATIONAL CONFERENCE ON INFRARED AND MILLIMETER WAVES AND 12TH INTERNATIONAL CONFERENCE ON TERAHERTZ ELECTRONICS, 2004, : 113 - 114
  • [43] Extended operation of the 1 MW, CW gyrotrons for W7-X
    Braune, H.
    Brand, P.
    Dammertz, G.
    Erckmann, V.
    Gantenbein, G.
    Kasparek, W.
    Laqua, H. P.
    Lechte, C.
    Leonhardt, W.
    Mellein, D.
    Michel, G.
    Noke, F.
    Purps, F.
    Schlueter, K. -H.
    Schmid, M.
    Thumm, M.
    2007 JOINT 32ND INTERNATIONAL CONFERENCE ON INFRARED AND MILLIMETER WAVES AND 15TH INTERNATIONAL CONFERENCE ON TERAHERTZ ELECTRONICS, VOLS 1 AND 2, 2007, : 103 - +
  • [44] Multiphysics analysis of W7-X control coils
    Zhu, Jiawu
    Bykov, Victor
    Ehrke, Gunnar
    Mendelevitch, Boris
    Naujoks, Dirk
    Wegener, Lutz
    Bosch, Hans-Stephan
    FUSION ENGINEERING AND DESIGN, 2019, 146 : 1369 - 1372
  • [45] Application of the engineering standard for functional safety to the W7-X central safety system
    Vilbrandt, Reinhard
    Bosch, Hans-Stephan
    Kuehner, Georg
    Naujoks, Dirk
    Schacht, Joerg
    Werner, Andreas
    Degenkolbe, Sven
    FUSION ENGINEERING AND DESIGN, 2017, 123 : 632 - 636
  • [46] Integration of the TESPEL injection system at W7-X
    Laube, Ralph
    Bussiahn, Rene
    Tamura, Naoki
    McCarthy, Kieran J.
    FUSION ENGINEERING AND DESIGN, 2020, 150
  • [47] Development of quench detection system for w7-x
    Birus, Dietrich
    Rummel, Thomas
    Fricke, Marko
    Petry, Klaus
    Demattio, Horst
    FUSION ENGINEERING AND DESIGN, 2007, 82 (5-14) : 1400 - 1405
  • [48] Status of the construction of the W7-X magnet system
    Wegener, L
    Gardebrecht, W
    Holzthüm, R
    Jaksic, N
    Kerl, F
    Sapper, J
    Wanner, M
    IEEE TRANSACTIONS ON APPLIED SUPERCONDUCTIVITY, 2002, 12 (01) : 653 - 658
  • [49] The cooling system for the 10 MW, 140 GHz, CW ECRH installation on Wendelstein 7-X
    Neffe, G
    Dammertz, G
    Thumm, M
    FUSION ENGINEERING AND DESIGN, 2001, 56-57 : 627 - 632
  • [50] 140 GHz, 1 MW CW Gyrotron Development for the ECH System of the Stellarator W7-X
    Gantenbein, G.
    Erckmann, V.
    Illy, S.
    Kern, S.
    Kasparek, W.
    Lechte, C.
    Leonhardt, W.
    Lievin, C.
    Samartsev, A.
    Schlaich, A.
    Schmid, M.
    Thumm, M.
    35TH INTERNATIONAL CONFERENCE ON INFRARED, MILLIMETER, AND TERAHERTZ WAVES (IRMMW-THZ 2010), 2010,