A multiobjective short-term optimal operation model for a cascade system of reservoirs considering the impact on long-term energy production

被引:44
|
作者
Xu, Bin [1 ,2 ]
Zhong, Ping-An [1 ,3 ]
Stanko, Zachary [2 ]
Zhao, Yunfa [4 ]
Yeh, William W-G [2 ]
机构
[1] Hohai Univ, Coll Hydrol & Water Resources, Nanjing, Peoples R China
[2] Univ Calif Los Angeles, Dept Civil & Environm Engn, Los Angeles, CA 90095 USA
[3] Hohai Univ, Natl Engn Res Ctr Water Resources Efficient Utili, Nanjing, Peoples R China
[4] China Three Gorges Corp, Beijing, Peoples R China
基金
中国国家自然科学基金;
关键词
GENETIC ALGORITHM; UNIT-COMMITMENT; OPTIMIZATION; GENERATION; FORECASTS;
D O I
10.1002/2014WR015964
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
This paper examines the impact of short-term operation on long-term energy production. We propose a multiobjective optimization model for the short-term, daily operation of a system of cascade reservoirs. The two objectives considered in the daily model are: (1) minimizing the total amount of water released and (2) maximizing the stored energy in the system. Optimizing short-term operation without considering its impact on long-term energy production does not guarantee maximum energy production in the system. Therefore, a major goal of this paper is to identify desirable short-term operation strategies that, at the same time, optimize long-term energy production. First, we solve the daily model for 1 month (30 days) using a nondominated genetic algorithm (NSGAII). We then use the nondominated solutions obtained by NSGAII to assess the impact on long-term energy production using a monthly model. We use historical monthly inflows to characterize the inflow variability. We apply the proposed methodology to the Qingjiang cascade system of reservoirs in China. The results show: (1) in average hydrology scenarios, the solution maximizing stored energy produces the most overall long-term energy production; (2) in moderately wet hydrology scenarios, the solution minimizing water released outperforms the maximizing stored energy solution; and (3) when extremely wet hydrology scenarios are expected, a compromise solution is the best strategy.
引用
收藏
页码:3353 / 3369
页数:17
相关论文
共 50 条
  • [31] SHORT-TERM PROACTIVE INTERFERENCE - SHORT-TERM OR LONG-TERM
    LOFTUS, GR
    PATTERSON, KK
    BULLETIN OF THE PSYCHONOMIC SOCIETY, 1974, 4 (NA4) : 240 - 240
  • [32] Impact of operation duration on short-term and long-term prognosis in patients undergoing radical colorectal
    Shen, Xuefang
    Zhou, Changming
    Hua, Qing
    Yang, Liu
    Zhao, Weiwei
    Xu, Pingbo
    JOURNAL OF CANCER, 2022, 13 (03): : 1160 - 1167
  • [33] An analysis of long-term and short-term impact of climate change on rice production in India
    Singh, Arshdeep
    Arora, Kashish
    Babu, Suresh Chandra
    CHINA AGRICULTURAL ECONOMIC REVIEW, 2024, 16 (02) : 290 - 319
  • [34] Multi-Stage Dynamic Programming Method for Short-Term Cascade Reservoirs Optimal Operation with Flow Attenuation
    Changming Ji
    Chuangang Li
    Boquan Wang
    Minghao Liu
    Liping Wang
    Water Resources Management, 2017, 31 : 4571 - 4586
  • [35] Multi-Stage Dynamic Programming Method for Short-Term Cascade Reservoirs Optimal Operation with Flow Attenuation
    Ji, Changming
    Li, Chuangang
    Wang, Boquan
    Liu, Minghao
    Wang, Liping
    WATER RESOURCES MANAGEMENT, 2017, 31 (14) : 4571 - 4586
  • [36] Energy Storage for Short-Term and Long-Term Wind Energy Support
    Esmaili, Ali
    Nasiri, Adel
    IECON 2010 - 36TH ANNUAL CONFERENCE ON IEEE INDUSTRIAL ELECTRONICS SOCIETY, 2010,
  • [37] Multiobjective Scheduling Method for Short-Term Peak Shaving Operation of Cascade Hydro Plants
    Zhou, Lingan
    Cheng, Chuntian
    Liao, Shengli
    Wang, Jian
    JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2020, 146 (09)
  • [38] Coupling the long-term and short-term optimization models for reservoir operation
    Dong, Xiaohua
    Zhao, Yunfa
    Yuan, Jie
    Peng, Qiyou
    Guo, Shenglian
    DAMS AND RESERVOIRS, SOCIETIES AND ENVIRONMENT IN THE 21ST CENTURY, VOLS 1 AND 2, 2006, : 277 - +
  • [39] LONG-TERM OPTIMAL OPERATION OF A POWER SYSTEM
    HALLIBURTON, TS
    SIRISENA, HR
    IEE PROCEEDINGS-C GENERATION TRANSMISSION AND DISTRIBUTION, 1982, 129 (05) : 185 - 191
  • [40] Long-Term Scheduling of Cascade Reservoirs Considering Inflow Forecasting Uncertainty Based on a Disaggregation Model
    Ding, Xiaoling
    Mo, Xiaocong
    Zhou, Jianzhong
    Bi, Sheng
    Jia, Benjun
    Liao, Xiang
    WATER RESOURCES MANAGEMENT, 2021, 35 (02) : 645 - 660