Optimal work breaks in deterministic and probabilistic repetitive projects

被引:0
|
作者
Ioannou, Photios G. [1 ]
Srisuwanrat, Chachrist [1 ]
机构
[1] Univ Michigan, Dept Civil & Environm Engn, Ann Arbor, MI 48109 USA
关键词
D O I
暂无
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
An effective way to reduce the duration and cost of projects with repetitive activities is through the relaxation of resource continuity and the introduction of work breaks at strategic points between repetitive project units. This paper describes the problem and introduces the basic concepts for determining the optimal location and duration of work breaks for both deterministic and probabilistic activity durations. The procedure is described in detail and is applied to an example project with 9 activities with probabilistic durations that repeat over 10 similar work units. The solution employs concepts from the Repetitive Scheduling Method (RSM), the Sequence Step Algorithm (SQS-AL), and is modeled in STROBOSCOPE, an activity-based simulation system. Numerical and graphical results explain the process and the underlying time and cost tradeoffs.
引用
收藏
页码:2120 / 2129
页数:10
相关论文
共 50 条
  • [21] Repetitive and unpublished projects
    Mathew, Abraham
    CURRENT SCIENCE, 2007, 93 (02): : 126 - 126
  • [22] Structural breaks with deterministic and stochastic trends
    Perron, P
    Zhu, XK
    JOURNAL OF ECONOMETRICS, 2005, 129 (1-2) : 65 - 119
  • [23] Probabilistic crowding: Deterministic crowding with probabilistic replacement
    Mengshoel, OJ
    Goldberg, DE
    GECCO-99: PROCEEDINGS OF THE GENETIC AND EVOLUTIONARY COMPUTATION CONFERENCE, 1999, : 409 - 416
  • [24] A DETERMINISTIC AND PROBABILISTIC APPROACH FOR ROBUST OPTIMAL DESIGN OF A 6-DOF HAPTIC DEVICE
    Ahmad, Aftab
    Andersson, Kjell
    Sellgren, Ulf
    PROCEEDINGS OF THE ASME INTERNATIONAL DESIGN ENGINEERING TECHNICAL CONFERENCES AND COMPUTERS AND INFORMATION IN ENGINEERING CONFERENCE, 2013, VOL 3B, 2014,
  • [25] Optimal processes for probabilistic work extraction beyond the second law
    Vasco Cavina
    Andrea Mari
    Vittorio Giovannetti
    Scientific Reports, 6
  • [26] Optimal processes for probabilistic work extraction beyond the second law
    Cavina, Vasco
    Mari, Andrea
    Giovannetti, Vittorio
    SCIENTIFIC REPORTS, 2016, 6
  • [27] Integrated methodology to design and manage work-in-process buffers in repetitive building projects
    Gonzalez, V.
    Alarcon, L. F.
    Yiu, T. W.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2013, 64 (08) : 1182 - 1193
  • [28] Deterministic and probabilistic voting models
    Burden, BC
    AMERICAN JOURNAL OF POLITICAL SCIENCE, 1997, 41 (04) : 1150 - 1169
  • [29] Deterministic networks for probabilistic computing
    Jakob Jordan
    Mihai A. Petrovici
    Oliver Breitwieser
    Johannes Schemmel
    Karlheinz Meier
    Markus Diesmann
    Tom Tetzlaff
    Scientific Reports, 9
  • [30] Mixed deterministic and probabilistic networks
    Robert Mateescu
    Rina Dechter
    Annals of Mathematics and Artificial Intelligence, 2008, 54 : 3 - 51