Analysis of Settlement Induced by Shield Construction of the Metro Passing under Existing Buildings Based on the Finite Difference Method

被引:5
|
作者
Wang, Rui [1 ]
Zhang, Bin [2 ]
Wang, You [1 ]
机构
[1] Cent South Univ, Sch Civil Engn, Changsha 410075, Peoples R China
[2] China Railway Shanghai Investment Grp Co Ltd, Shanghai 200126, Peoples R China
基金
中国国家自然科学基金;
关键词
TUNNEL; PRESSURE; MODEL;
D O I
10.1155/2022/1206867
中图分类号
P3 [地球物理学]; P59 [地球化学];
学科分类号
0708 ; 070902 ;
摘要
A frequent problem when constructing metro tunnels is the uneven settlement of adjacent buildings, which results in huge economic losses. Due to shields causing the settlement of adjacent buildings, this study took the Nantong Metro Line 1 as the research object. The metro runs from the East Huancheng Road Station to the Nantong Intermediate People's Court Station and passes under the old residential area of the Community Sendadi-Huayuan building. Based on the settlement monitoring data, this study analyzed the impact of tunnel shield construction on the foundation settlement of adjacent buildings. The computational analysis of the shield tunnel was performed by numerical simulation, taking into account the upper building load and the construction disturbance to the surrounding rock. Afterward, the study summarized the law behind the settlement. The results show that when the boring machine was tunneling through sandy soil and silt rich in water, its head was prone to twisting due to soil disturbance and the dissipation of pore water, causing instability in the excavation process and eventual ground settlement. In the sandy strata, the relationship between foundation settlement caused by shield construction and time can be approximated as an exponential function in a certain area. The vibrations from shield excavation caused the foundations to vibrate for a short period of time. Therefore, the average settlement of buildings directly above the underpass reached 7 mm/d. Likewise, the tunneling shield caused a 1.5 mm settlement before passing under the building. It caused a peak settlement of 4.0 and 5.1 mm during and after passing under the buildings, respectively. The width of the settlement troughs of approximately 7D formed after the tunnel was excavated. Shield excavation placed the soil at the top of the excavation face in a state of tensile stress, causing tensile and shear damage to the soil and forming a local plastic zone.
引用
收藏
页数:15
相关论文
共 50 条
  • [31] Surface settlement analysis of shield passing through power tunnel and directly cutting pile foundation of Hangzhou Metro Line 4
    Zhang J.-H.
    Wang H.-W.
    Chen P.-X.
    Xu F.
    Wu J.
    Gongcheng Lixue/Engineering Mechanics, 2022, 39 : 144 - 152
  • [32] Impact analysis of post-construction settlement of open-cut metro station on adjacent buildings
    Qin, Dongping
    He, Ping
    Li, Yujie
    Zhongguo Tiedao Kexue/China Railway Science, 2011, 32 (05): : 83 - 89
  • [33] Analysis and Discussion on Surface Settlement induced by Shield Tunnel Construction of Adjacent Sructure
    Ding Zhi
    Wei Xin-Jiang
    Zhang Tao
    Ge Guo-Bao
    DISASTER ADVANCES, 2012, 5 (04): : 341 - 345
  • [34] Analysis and prediction of ground settlement induced by shield construction in Xi'an loess strata
    Zhu, Cai-Hui
    Li, Ning
    Zhang, Zhi-Qiang
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2010, 32 (07): : 1087 - 1095
  • [35] Analysis on Settlement of Existing Tunnel Induced by Twin Tunneling Underneath Based on Energy Method
    Liu, Tianyu
    Luo, Wenjun
    Yan, Jianwei
    Jiang, Xuehui
    Gongcheng Kexue Yu Jishu/Advanced Engineering Sciences, 2024, 56 (05): : 203 - 211
  • [36] Integrated Influence Zone Calculation Method for the Existing Metro Tunnel Under the Influence of Adjacent Construction
    Han, Yuzhen
    Nie, Xiaofan
    Chen, Xiangsheng
    URBAN RAIL TRANSIT, 2023, 9 (03) : 195 - 204
  • [37] Integrated Influence Zone Calculation Method for the Existing Metro Tunnel Under the Influence of Adjacent Construction
    Yuzhen Han
    Xiaofan Nie
    Xiangsheng Chen
    Urban Rail Transit, 2023, 9 : 195 - 204
  • [38] Analysis of additional soil stress caused by shield construction under existing superstructure loads
    Wu C.
    Wei C.
    Qiao F.
    1708, Academia Sinica (37): : 1708 - 1721
  • [39] Data based complex network modeling and analysis of shield tunneling performance in metro construction
    Zhou, C.
    Ding, L. Y.
    Skibniewski, Miroslaw J.
    Luo, Hanbin
    Zhang, H. T.
    ADVANCED ENGINEERING INFORMATICS, 2018, 38 : 168 - 186
  • [40] Machine learning-based forecasting of soil settlement induced by shield tunneling construction
    Ye, Xiao-Wei
    Jin, Tao
    Chen, Yun-Min
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2022, 124