A Parallel Algorithm for Scheduling a Two-Machine Robotic Cell in Bicycle Frame Welding Process

被引:2
|
作者
Gnatowski, Andrzej [1 ]
Nizynski, Teodor [1 ]
机构
[1] Wroclaw Univ Sci & Technol, Dept Control Syst & Mechatron, PL-50370 Wroclaw, Poland
来源
APPLIED SCIENCES-BASEL | 2021年 / 11卷 / 17期
关键词
robotic cell; cyclic production; flexible production; scheduling; parallel computing; frame welding; GPU; M-MACHINE;
D O I
10.3390/app11178083
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Featured Application The proposed method can be applied to optimize welding stations with two or more positioners for each welding robot. Such robotic cells ares used, e.g., in welding aluminum bicycle frames. Welding frames with differing geometries is one of the most crucial stages in the production of high-end bicycles. This paper proposes a parallel algorithm and a mixed integer linear programming formulation for scheduling a two-machine robotic welding station. The time complexity of the introduced parallel method is O(log(2)n) on an n(3)-processor Exclusive Read Exclusive Write Parallel Random-Access Machine (EREW PRAM), where n is the problem size. The algorithm is designed to take advantage of modern graphics cards to significantly accelerate the computations. To present the benefits of the parallelization, the algorithm is compared to the state of art sequential method and a solver-based approach. Experimental results show an impressive speedup for larger problem instances-up to 314 on a single Graphics Processing Unit (GPU), compared to a single-threaded CPU execution of the sequential algorithm.
引用
收藏
页数:18
相关论文
共 50 条
  • [31] Two-machine flowshop scheduling with availability constraints
    Lee, CY
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 1999, 114 (02) : 420 - 429
  • [32] Fuzzy scheduling on two-machine flow shop
    Hong, TP
    Chuang, TN
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 1998, 6 (04) : 471 - 481
  • [33] Two-machine flowshop dynamic scheduling problem
    Chou, Fuh-Der
    Lee, Ching-En
    Kung Yeh Kung Chieng Hsueh K'an/Journal of the Chinese Institute of Industrial Engineers, 1998, 15 (04): : 315 - 324
  • [34] Stochastic scheduling for a two-machine open shop
    Righter, R
    JOURNAL OF APPLIED PROBABILITY, 1997, 34 (03) : 733 - 744
  • [35] Scheduling of a two-machine flowshop with availability constraints on the first machine
    Allaoui, H
    Artiba, A
    Elmaghraby, SE
    Riane, F
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 99 (1-2) : 16 - 27
  • [36] Scheduling Two-machine Flow Shop with a Batch Processing Machine
    Koh, Shiegheun
    Kim, Youngjin
    Lee, Woonseek
    CIE: 2009 INTERNATIONAL CONFERENCE ON COMPUTERS AND INDUSTRIAL ENGINEERING, VOLS 1-3, 2009, : 46 - 51
  • [37] New genetic algorithm for parallel machine scheduling with process constraint
    Yin, Wen-Jun
    Liu, Min
    Wu, Cheng
    Tien Tzu Hsueh Pao/Acta Electronica Sinica, 2001, 29 (11): : 1482 - 1485
  • [38] A dynamic programming algorithm for scheduling jobs in a two-machine open shop with an availability constraint
    Lorigeon, T
    Billaut, JC
    Bouquard, JL
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2002, 53 (11) : 1239 - 1246
  • [39] Two-agent scheduling in a two-machine open shop
    Liu, Peihai
    Gu, Manzhan
    Lu, Xiwen
    ANNALS OF OPERATIONS RESEARCH, 2024, 333 (01) : 275 - 301
  • [40] An improved approximation algorithm for the two-machine flow shop scheduling problem with an interstage transporter
    Soper, Alan J.
    Strusevich, Vitaly A.
    INTERNATIONAL JOURNAL OF FOUNDATIONS OF COMPUTER SCIENCE, 2007, 18 (03) : 565 - 591