Weekly hydropower scheduling of cascaded reservoirs with hourly power and capacity balances

被引:12
|
作者
Feng, Suzhen [1 ]
Zheng, Hao [1 ]
Qiao, Yifan [1 ]
Yang, Zetai [1 ]
Wang, Jinwen [1 ,2 ]
Liu, Shuangquan [3 ]
机构
[1] Huazhong Univ Sci & Technol, Sch Civil & Hydraul Engn, 1037 Luoyu Rd, Wuhan 430074, Hubei, Peoples R China
[2] Huazhong Univ Sci & Technol, Joint Int Water Secur Res Ctr, 1037 Luoyu Rd, Wuhan 430074, Hubei, Peoples R China
[3] Yunnan Elect Power Dispatch & Control Ctr, 17 Chuncheng Rd, Kunming 650011, Yunnan, Peoples R China
关键词
Hydropower scheduling; Large scale power system; Power and capacity balances; Mixed integer linear programming; Load balancing; Linearization; TERM; GENERATION; OPERATION; ALGORITHM;
D O I
10.1016/j.apenergy.2022.118620
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
A medium/long-term hydropower scheduling routinely assumes the energy produced in each week will be fully utilized in peak-shaving the power demands during every day in that week, ignoring the fluctuation of the hourly power loads. This work improves the traditional weekly hydropower scheduling by integrating the hourly power and capacity balances (HPCB), which has rarely been investigated, mainly due to great challenges imposed in solving the model. The HPCB are formulated into mixed integer linear constraints, involving the spare, maintenance, disabled, reserve and working capacities, as well as the order and levels of hydroplants in peak-shaving the hourly power load curve, all to be optimized. The formulation is then improved with successive strategies in updating water heads and peak-shaving hours, aiming to boost the solution efficiency by excluding more binary variables. The case studies involving 6 cascaded hydropower reservoirs in Lancang River reveal that the traditional weekly hydropower scheduling overestimates the benefits significantly, strongly suggesting the necessity to include the HPBC into a long/mid-term hydropower scheduling. The experiments also recommend an improved model formulation that achieves very consistent results on the top three prioritized objectives, while taking less than 0.1 s to solve the problem involving all six cascaded reservoirs, demonstrating a great prospect in solving problems in large scale.
引用
收藏
页数:17
相关论文
共 50 条
  • [11] Deep Reinforcement Learning for Cascaded Hydropower Reservoirs Considering Inflow Forecasts
    Wei Xu
    Xiaoli Zhang
    Anbang Peng
    Yue Liang
    [J]. Water Resources Management, 2020, 34 : 3003 - 3018
  • [12] Deep Reinforcement Learning for Cascaded Hydropower Reservoirs Considering Inflow Forecasts
    Xu, Wei
    Zhang, Xiaoli
    Peng, Anbang
    Liang, Yue
    [J]. WATER RESOURCES MANAGEMENT, 2020, 34 (09) : 3003 - 3018
  • [13] Chance-Constrained Optimal Hedging Rules for Cascaded Hydropower Reservoirs
    Zeng, Yun
    Wu, Xinyu
    Cheng, Chuntian
    Wang, Yuqian
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2014, 140 (07)
  • [14] Modeling for Cascaded Reservoirs Scheduling Considering Policy Factors
    Zhang, Jingrui
    Li, Wu
    Chen, Yang
    Li, Jinpeng
    [J]. INTERNATIONAL JOINT CONFERENCE ON COMPUTATIONAL SCIENCES AND OPTIMIZATION, VOL 2, PROCEEDINGS, 2009, : 447 - +
  • [15] Optimal Weekly Operation Scheduling of Pumped Storage Hydropower Plant Considering Optimal Hot Reserve Capacity in a Power System with a Large Penetration of Photovoltaic Generation
    Aihara, Ryota
    Yokoyama, Akihiko
    [J]. ELECTRICAL ENGINEERING IN JAPAN, 2016, 195 (02) : 35 - 48
  • [16] Implications of environmental constraints in hydropower scheduling for a power system with limited grid and reserve capacity
    Schaffer, Linn Emelie
    Korpas, Magnus
    Bakken, Tor Haakon
    [J]. ENERGY SYSTEMS-OPTIMIZATION MODELING SIMULATION AND ECONOMIC ASPECTS, 2023,
  • [17] An Efficient Linearization Method for Long-Term Operation of Cascaded Hydropower Reservoirs
    Kang, Chuanxiong
    Chen, Cheng
    Wang, Jinwen
    [J]. WATER RESOURCES MANAGEMENT, 2018, 32 (10) : 3391 - 3404
  • [18] Centralized versus Distributed Cooperative Operating Rules for Multiple Cascaded Hydropower Reservoirs
    Wu, Xinyu
    Cheng, Chuntian
    Zeng, Yun
    Lund, Jay R.
    [J]. JOURNAL OF WATER RESOURCES PLANNING AND MANAGEMENT, 2016, 142 (11)
  • [19] An Efficient Linearization Method for Long-Term Operation of Cascaded Hydropower Reservoirs
    Chuanxiong Kang
    Cheng Chen
    Jinwen Wang
    [J]. Water Resources Management, 2018, 32 : 3391 - 3404
  • [20] Investigation on Water Levels for Cascaded Hydropower Reservoirs to Drawdown at the End of Dry Seasons
    Liu, Shuangquan
    Luo, Xuhan
    Zheng, Hao
    Zhang, Congtong
    Wang, Youxiang
    Chen, Kai
    Wang, Jinwen
    [J]. WATER, 2023, 15 (02)