Optimal Restoration of Distribution Systems Considering Temporary Closed-Loop Operation

被引:10
|
作者
Vargas, Renzo [1 ,2 ]
Macedo, Leonardo H. [1 ]
Home-Ortiz, Juan M. [1 ]
Romero, Ruben [1 ]
机构
[1] Sao Paulo State Univ, Dept Elect Engn, BR-15385000 Ilha Solteira, Brazil
[2] Fed Univ ABC UFABC, Engn Modeling & Appl Social Sci Ctr, BR-09210580 Santo Andre, SP, Brazil
来源
IEEE SYSTEMS JOURNAL | 2021年 / 15卷 / 04期
关键词
Switches; Substations; Network topology; Topology; Linear programming; Reactive power; Mathematical model; Closed-loop topology operation; distributed generation (DG); distribution systems optimization; mixed-integer second-order cone programming (MISOCP); restoration problem; DISTRIBUTION NETWORK RESTORATION; SERVICE RESTORATION; MODEL;
D O I
10.1109/JSYST.2021.3073941
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This article presents a new mathematical model to solve the restoration problem in balanced distribution systems with distributed generators (DGs) considering closed-loop topology operation during the restorative state. The restorative state is comprised of the interval of time since the permanent fault has been isolated until the time at which the faulted zone is repaired. During this interval of time, switching operations are performed to minimize the negative effects resulting from the occurrence of a permanent fault in the network. In this way, the two main objective functions of the restoration problem are to minimize the amount of load curtailment in the restored system and to minimize the number of switching operations. Conventionally, the network topology is maintained radial throughout the restorative state. In this article, the possibility of forming loops is considered for improving both objective functions. As such, a new mixed-integer second-order cone programming model is proposed, considering the temporary formation of operational loops in the restorative state, and both connected and islanded operation of the DGs. Several tests are carried out using a 53-node test system and a 2313-node system for single and multiple fault scenarios. The results obtained with the proposed model outperform the solutions achieved when only open-loop configurations are considered for the restoration problem. Moreover, it is verified that the islanded operation of the DGs provides more flexibility to the network, allowing more load to be restored.
引用
收藏
页码:5483 / 5494
页数:12
相关论文
共 50 条
  • [1] Optimal Restoration of Active Distribution Systems With Voltage Control and Closed-Loop Operation
    Vargas, Renzo
    Macedo, Leonardo H.
    Home-Ortiz, Juan M.
    Sanches Mantovani, Jose Roberto
    Romero, Ruben
    [J]. IEEE TRANSACTIONS ON SMART GRID, 2021, 12 (03) : 2295 - 2306
  • [2] Optimal Operation of Active Distribution Systems with Voltage Control and Closed-Loop Topology
    Home-Ortiz, Juan M.
    Macedo, Leonardo H.
    Mantovani, Jose R. S.
    Romero, Ruben
    Vargas, Renzo
    Catalao, Joao P. S.
    [J]. 2021 IEEE MADRID POWERTECH, 2021,
  • [3] Nature and Operation Schemes of Normally Closed-Loop Distribution Systems
    Huang, Wei-Tzer
    Wang, Shyi-Wen
    Hong, Ling-Yi
    Lin, Deng-Chung
    [J]. 2008 10TH INTERNATIONAL CONFERENCE ON CONTROL AUTOMATION ROBOTICS & VISION: ICARV 2008, VOLS 1-4, 2008, : 1718 - 1723
  • [4] Closed-Loop Systems for the Operation Room (OR)
    Stallkamp, J.
    [J]. ENDOSKOPIE HEUTE, 2011, 24 (04) : 248 - 251
  • [5] Short-circuit constrained distribution network reconfiguration considering closed-loop operation
    Macedo, Leonardo H.
    Home-Ortiz, Juan M.
    Vargas, Renzo
    Mantovani, Jose R. S.
    Romero, Ruben
    Catalao, Joao P. S.
    [J]. SUSTAINABLE ENERGY GRIDS & NETWORKS, 2022, 32
  • [6] Closed-loop optimal operation of batch distillation columns
    Barolo, M
    Dal Cengio, P
    [J]. COMPUTERS & CHEMICAL ENGINEERING, 2001, 25 (4-6) : 561 - 569
  • [7] A COMMENT ON CLOSED-LOOP OPTIMAL GUIDANCE SYSTEMS
    RANG, ER
    [J]. IEEE TRANSACTIONS ON AUTOMATIC CONTROL, 1966, AC11 (03) : 616 - &
  • [8] Optimal mobile controls in closed-loop systems
    Kubyshkin, VA
    [J]. JOURNAL OF COMPUTER AND SYSTEMS SCIENCES INTERNATIONAL, 1998, 37 (06) : 902 - 908
  • [9] Reliability Analysis of Distribution Network with Closed-loop Operation
    Yang, Fan
    Zhang, Li
    Chen, Rongrong
    Xu, Jun
    Shi, Ling
    Tang, Haifeng
    [J]. 2020 5TH ASIA CONFERENCE ON POWER AND ELECTRICAL ENGINEERING (ACPEE 2020), 2020, : 1719 - 1724
  • [10] Modeling and optimal operation of batch closed-loop diafiltration processes
    Sharma, Ayush
    Jelemensky, Martin
    Paulen, Radoslav
    Fikar, Miroslav
    [J]. CHEMICAL ENGINEERING RESEARCH & DESIGN, 2017, 122 : 198 - 210