Decision Support Tool for Offshore Wind Farm Vessel Routing under Uncertainty

被引:12
|
作者
Dawid, Rafael [1 ]
McMillan, David [1 ]
Revie, Matthew [2 ]
机构
[1] Univ Strathclyde, Dept Elect & Elect Engn, Glasgow G1 1XW, Lanark, Scotland
[2] Univ Strathclyde, Dept Management Sci, Glasgow G1 1XW, Lanark, Scotland
基金
英国工程与自然科学研究理事会;
关键词
vessel routing; O& M planning; offshore wind; VRP; optimisation; SOFT TIME WINDOWS; TRAVEL-TIMES; STOCHASTIC SERVICE; MAINTENANCE; OPTIMIZATION; ALGORITHM; DEMANDS; MODELS;
D O I
10.3390/en11092190
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
This paper for the first time captures the impact of uncertain maintenance action times on vessel routing for realistic offshore wind farm problems. A novel methodology is presented to incorporate uncertainties, e.g., on the expected maintenance duration, into the decision-making process. Users specify the extent to which these unknown elements impact the suggested vessel routing strategy. If uncertainties are present, the tool outputs multiple vessel routing policies with varying likelihoods of success. To demonstrate the tool's capabilities, two case studies were presented. Firstly, simulations based on synthetic data illustrate that in a scenario with uncertainties, the cost-optimal solution is not necessarily the best choice for operators. Including uncertainties when calculating the vessel routing policy led to a 14% increase in the number of wind turbines maintained at the end of the day. Secondly, the tool was applied to a real-life scenario based on an offshore wind farm in collaboration with a United Kingdom (UK) operator. The results showed that the assignment of vessels to turbines generated by the tool matched the policy chosen by wind farm operators. By producing a range of policies for consideration, this tool provided operators with a structured and transparent method to assess trade-offs and justify decisions.
引用
收藏
页数:17
相关论文
共 50 条
  • [41] A hybrid multi-agent metaheuristic for the offshore wind farm cable routing problem
    Machado, Murilo Oliveira
    Fernandes, Islame Felipe da Costa
    Maia, Silvia Maria Diniz Monteiro
    Goldbarg, Elizabeth Ferreira Gouvea
    EXPERT SYSTEMS WITH APPLICATIONS, 2024, 255
  • [42] UNCERTAINTY OF VIRTUALLY SENSED STRESS RANGES IN OFFSHORE WIND SUPPORT STRUCTURES
    Toftekaer, Johan F.
    Vestermark, Jonas T.
    Jepsen, Michael S.
    PROCEEDINGS OF ASME 2023 42ND INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE & ARCTIC ENGINEERING, OMAE2023, VOL 1, 2023,
  • [43] A metaheuristic solution method for optimizing vessel fleet size and mix for maintenance operations at offshore wind farms under uncertainty
    Halvorsen-Weare, Elin Espeland
    Norstad, Inge
    Stalhane, Magnus
    Nonas, Lars Magne
    14TH DEEP SEA OFFSHORE WIND R&D CONFERENCE, EERA DEEPWIND'2017, 2017, 137 : 531 - 538
  • [44] Scheduling of Maintenance Tasks and Routing of a Joint Vessel Fleet for Multiple Offshore Wind Farms
    Raknes, Nora Tangen
    Odeskaug, Katrine
    Stalhane, Magnus
    Hvattum, Lars Magnus
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2017, 5 (01)
  • [45] A computer tool for optimisation and simulation of marine operations for offshore wind farm installation
    Halvorsen-Weare, Elin Espeland
    Fonn, Eivind
    Johannessen, Kjetil
    Kisialiou, Yauheni
    Nonas, Lars Magne
    Rialland, Agathe
    Thun, Kristian
    EERA DEEPWIND'2021, 2021, 2018
  • [46] Optimal Power Dispatch of an Offshore Wind Farm under Generator Fault
    Ma, Kuichao
    Zhu, Jiangsheng
    Soltani, Mohsen
    Hajizadeh, Amin
    Chen, Zhe
    APPLIED SCIENCES-BASEL, 2019, 9 (06):
  • [47] Multi-criteria decision analysis of offshore wind turbines support structures under stochastic inputs
    Kolios, A. J.
    Rodriguez-Tsouroukdissian, A.
    Salonitis, K.
    SHIPS AND OFFSHORE STRUCTURES, 2016, 11 (01) : 38 - 49
  • [48] Anglers? support for an offshore wind farm: Fishing effects or clean energy symbolism
    Bidwell, David
    Smythe, Tiffany
    Tyler, Grant
    MARINE POLICY, 2023, 151
  • [49] Vessel routing and scheduling under uncertainty in the liquefied natural gas business
    Halvorsen-Weare, Elin E.
    Fagerholt, Kjetil
    Roennqvist, Mikael
    COMPUTERS & INDUSTRIAL ENGINEERING, 2013, 64 (01) : 290 - 301
  • [50] Combined wind turbine design and wind farm layout optimisation under wind resource uncertainty
    Swamy, S. Krishna
    Szklarz, S.
    Fonseca, R. M.
    Bulder, B. H.
    SCIENCE OF MAKING TORQUE FROM WIND (TORQUE 2020), PTS 1-5, 2020, 1618