Operational Risk-Based Decision Making for Wastewater Pipe Management

被引:2
|
作者
Balekelayi, Ngandu [1 ]
Tesfamariam, Solomon [1 ]
机构
[1] Univ British Columbia, Sch Engn, Okanagan Campus,1137 Alumni Ave, Kelowna, BC V1V 1V7, Canada
关键词
Decision making; Risk; Geoadditive; Graph theory; Data fusion; Ordered weighted averaging (OWA); PREDICTION MODELS; OWA OPERATORS; NETWORK; INFORMATION; INSPECTION; SYSTEMS; FUSION; AGGREGATION; ALGORITHM; RANKING;
D O I
10.1061/(ASCE)IS.1943-555X.0000586
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Recent advances in the development of wastewater pipe deterioration models allow a better quantification of the uncertainty in the likelihood of failure of pipes. However, the consequence of failure is subjected to many uncertainties that are not easy to be captured and support effective risk-based decision making. One component of the consequence of failure is the effect of the failed components on the network-level performance. An operational risk metric index is defined as a combination of the probability of failure and the effect (consequence) of the failed component at the network level. Three topological graph metrics (betweenness, eigenvector centrality, and principal component centrality) are used to identify the criticality of components in large wastewater systems. Their impact on the network performance is quantified in terms of graph connectivity. Both metrics lead to different rankings of components, making hard the decision-making process. The ordered weighted averaging (OWA) technique is used, as a data fusion technique, to determine a new consequence metric that is an aggregation of the information obtained from individual graph theoretical metrics. This metric is coupled with the likelihood of failure to quantify the operational risk of failure of the components. The uncertainty is propagated through the orness function, which is dependent of the decision-maker's attitude toward risk. The results show that the OWA aggregation reasonably captured the critical areas in the city. Different risk levels are identified and projected onto GIS maps for visualization of the high-risk pipes in the network. The proposed approach is applied on the wastewater system of the city of Calgary.
引用
收藏
页数:16
相关论文
共 50 条
  • [41] Decision analysis: A method for taking uncertainties into account in risk-based decision making
    Peterman, RM
    Anderson, JL
    HUMAN AND ECOLOGICAL RISK ASSESSMENT, 1999, 5 (02): : 231 - 244
  • [42] Framework for Risk-Based Decision Support on Infiltration and Inflow to Wastewater Systems
    Saletti, Anna Ohlin
    Rosen, Lars
    Lindhe, Andreas
    WATER, 2021, 13 (17)
  • [43] Risk-Based Decision Support System for US Air Force Water and Wastewater Infrastructure Asset Management
    Uslu, Berk
    Abernethy, Robert
    PIPELINES 2020: PLANNING AND DESIGN, 2020, : 28 - 33
  • [44] Development of an algorithm for risk-based management of wastewater reuse alternatives
    Shakeri, Hossein
    Nazif, Sara
    JOURNAL OF WATER REUSE AND DESALINATION, 2018, 8 (01): : 38 - 57
  • [45] Default risk-based probabilistic decision model for risk management and control
    Chen, Cheng-Wu
    Tseng, Chun-Pin
    NATURAL HAZARDS, 2012, 63 (02) : 659 - 671
  • [46] Default risk-based probabilistic decision model for risk management and control
    Cheng-Wu Chen
    Chun-Pin Tseng
    Natural Hazards, 2012, 63 : 659 - 671
  • [47] A novel group decision making method for airport operational risk management
    Sun, Bo
    Wei, Ming
    Wu, Wei
    Jing, Binbin
    MATHEMATICAL BIOSCIENCES AND ENGINEERING, 2020, 17 (03) : 2402 - 2417
  • [48] A study on operational risk management for financial institution based on the reconstruction of decision-making structure
    Wang, Ke
    Chen, Jian-an
    PROCEEDINGS OF 2008 INTERNATIONAL CONFERENCE ON RISK AND RELIABILITY MANAGEMENT, VOLS I AND II, 2008, : 77 - 83
  • [49] Sex differences in risk-based decision making in adolescents with conduct disorder
    Justina Sidlauskaite
    Karen González-Madruga
    Areti Smaragdi
    Roberta Riccelli
    Ignazio Puzzo
    Molly Batchelor
    Harriet Cornwell
    Luke Clark
    Edmund J. S. Sonuga-Barke
    Graeme Fairchild
    European Child & Adolescent Psychiatry, 2018, 27 : 1133 - 1142
  • [50] A WHO tool for risk-based decision making on blood safety interventions
    Janssen, Mart P.
    Nuebling, C. Micha
    Lery, Francois-Xavier
    Maryuningsih, Yuyun S.
    Epstein, Jay S.
    TRANSFUSION, 2021, 61 (02) : 503 - 515