Staff scheduling optimization in information technology projects

被引:0
|
作者
Filho, Amaury Brasil [1 ]
Marcal, Ana Sofia [1 ,2 ]
Costa, Gabriela [1 ,3 ]
Pinheiro, Placido [1 ]
机构
[1] Univ Fortaleza Grad Appl Comp Sci, BR-60811341 Fortaleza, Ceara, Brazil
[2] CESAR Recife Ctr Adv Syst & Studies, BR-50030390 Recife, PE, Brazil
[3] Atlantic Inst, BR-60822780 Fortaleza, Ceara, Brazil
关键词
linear programming; multicriteria; project management;
D O I
暂无
中图分类号
F [经济];
学科分类号
02 ;
摘要
In an organization that develops Information Technology projects, often exists staff scheduling demands. In most of these organizations the resources are simultaneously shared between many projects. The organization has the responsibility of doing this optimized staff scheduling attending the projects demands. But, this is not a simple task to do and it turns more complex as the number of projects and professional increases. This paper proposes a mathematical programming model supported by multicriteria that will assist the Information Technology organization during the staff scheduling activity. The proposed model aims to optimize the demands of the professionals to the Information Technology projects.
引用
收藏
页码:312 / +
页数:3
相关论文
共 50 条
  • [1] A Novel Approach Based on Staff Scheduling Optimization in Information Technology Projects
    Brasil Filho, Amaury
    Marcal, Ana Sofia
    Costa, Gabriela
    Pinheiro, Placido Rogerio
    Pinheiro, Rebecca Filgueiras
    INTERNATIONAL JOURNAL OF COMPUTER SCIENCE AND NETWORK SECURITY, 2009, 9 (09): : 277 - 286
  • [2] A bilevel whale optimization algorithm for risk management scheduling of information technology projects considering outsourcing
    Lu, Fuqiang
    Yan, Tongren
    Bi, Hualing
    Feng, Ming
    Wang, Suxin
    Huang, Min
    KNOWLEDGE-BASED SYSTEMS, 2022, 235
  • [3] SCHEDULING OF REPETITIVE PROJECTS WITH COST OPTIMIZATION
    MOSELHI, O
    ELRAYES, K
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 1993, 119 (04): : 681 - 697
  • [4] Evaluation of information technology projects
    Orlowski, C
    Szczerbicki, E
    CYBERNETICS AND SYSTEMS, 2002, 33 (06) : 659 - 673
  • [5] A SPREADSHEET OPTIMIZATION SYSTEM FOR LIBRARY STAFF SCHEDULING
    ASHLEY, DW
    COMPUTERS & OPERATIONS RESEARCH, 1995, 22 (06) : 615 - 624
  • [6] Chronographical Spatiotemporal Scheduling Optimization for Building Projects
    Francis, Adel
    FRONTIERS IN BUILT ENVIRONMENT, 2019, 5
  • [7] Scheduling software projects to minimize the development time and cost with a given staff
    Padberg, F
    APSEC 2001: EIGHTH ASIA-PACIFIC SOFTWARE ENGINEERING CONFERENCE, PROCEEDINGS, 2001, : 187 - 194
  • [8] NSF funds information technology projects
    不详
    DR DOBBS JOURNAL, 2001, 26 (01): : 18 - 18
  • [9] Modelling success in information technology projects
    Sameron, Jose L.
    Baldomero Ramirez, M.
    International E-Conference on Computer Science 2005, 2005, 2 : 124 - 127
  • [10] Management of risks in information technology projects
    Baccarini, D
    Salm, G
    Love, PED
    INDUSTRIAL MANAGEMENT & DATA SYSTEMS, 2004, 104 (3-4) : 286 - 295