Hydropower potential of municipal water supply dams in Turkey: A case study in Ulutan Dam

被引:14
|
作者
Kucukali, Serhat [1 ]
机构
[1] Zonguldak Karaelmas Univ, Dept Civil Engn, TR-67100 Incivez, Zonguldak, Turkey
关键词
Hydropower; Turkey; Water supply dams;
D O I
10.1016/j.enpol.2010.06.021
中图分类号
F [经济];
学科分类号
02 ;
摘要
This paper aims to analyze the hydropower potential of municipal water supply dams in Turkey The facility is in favor with the energy policy of Turkish Government and European Union In the study, the design head of the power plant was selected as the average water level of the reservoir and the discharge was calculated from the annual water supply of the dam. It has been estimated that the existing 45 municipal water supply dams of Turkey have an electric energy potential of 173 GWh/year, corresponding to about 24,000,000 Euro/year economic benefit The financing of these facilities can be provided from international funding institutions For a case study. Zonguldak Ulutan Dam and its water treatment plant have been investigated in detail The current electricity consumption of the water treatment plant is 4,500,000 kWh/year and the facility provides 35,000 m(3)/day water to 6 settlements. The installation of a hydropower plant on the mentioned water treatment plant will cut the electric consumption by 24%. The proposed project has a payback period of 14 years and it can produce clean and feasible energy. (C) 2010 Elsevier Ltd All rights reserved.
引用
收藏
页码:6534 / 6539
页数:6
相关论文
共 50 条
  • [21] Water leakage from the power tunnel of Gezende Dam, southern Turkey: a case study
    Turkmen, Sedat
    ENVIRONMENTAL EARTH SCIENCES, 2010, 61 (02) : 419 - 427
  • [22] Impacts of construction of dam on the flow regimes and water quality: a case study from Turkey
    A. Bor
    Ş. Elçi
    International Journal of Environmental Science and Technology, 2022, 19 : 4069 - 4086
  • [23] Water leakage from the power tunnel of Gezende Dam, southern Turkey: a case study
    Sedat Türkmen
    Environmental Earth Sciences, 2010, 61 : 419 - 427
  • [24] Water leakage problems at the Tangab Dam Reservoir (SW Iran), case study of the complexities of dams on karst
    Morteza Mozafari
    Petar Milanović
    Jalal Jamei
    Bulletin of Engineering Geology and the Environment, 2021, 80 : 7989 - 8007
  • [25] Water leakage problems at the Tangab Dam Reservoir (SW Iran), case study of the complexities of dams on karst
    Mozafari, Morteza
    Milanovic, Petar
    Jamei, Jalal
    BULLETIN OF ENGINEERING GEOLOGY AND THE ENVIRONMENT, 2021, 80 (10) : 7989 - 8007
  • [26] Sedimentation Problems and Suggested Solutions of Istanbul's Drinking Water Dams: A Case Study of Alibey Dam
    Celik, Huseyin E.
    Sengonul, Kamil
    Akyuz, Feyza
    Altunel, Oguz
    Dagci, Mehmet
    Esin, A. Ilker
    JOURNAL OF THE FACULTY OF FORESTRY-ISTANBUL UNIVERSITY, 2012, 62 (02): : 113 - 127
  • [27] Modified risk assessment tool for embankment dams: case study of three dams in Turkey
    Aydemir, Alper
    Guven, Aytac
    CIVIL ENGINEERING AND ENVIRONMENTAL SYSTEMS, 2017, 34 (01) : 53 - 67
  • [28] ESTIMATING THE PROFITABILITY OF HYDROPOWER INVESTMENTS WITH A CASE STUDY FROM TURKEY
    Akcay, Emre Caner
    Dikmen, Irem
    Birgonul, M. Talat
    Arditi, David
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (08) : 1002 - 1012
  • [29] Investigation of the optimal method for determining hydropower potential of small streams: a case study Batman Basin in Turkey
    Yuksel I.
    Demirel I.H.
    Arabian Journal of Geosciences, 2021, 14 (7)
  • [30] Safety Assurance on Existing Dams. Case Study - Tungujei Dam
    Boariu, C.
    Bofu, C.
    MODERN TECHNOLOGIES FOR THE 3RD MILLENNIUM, 2017, : 7 - 12