共 50 条
- [21] Analysis on the Sensitivity of Structure in Girder Steel Bridge Deck Pavement [J]. ADVANCED RESEARCH ON ADVANCED STRUCTURE, MATERIALS AND ENGINEERING, 2012, 382 : 466 - +
- [23] Composite action between girder and bridge deck with precast panels [J]. PCI JOURNAL, 2001, 46 (01): : 85 - 85
- [26] Design and construction of open deck bridge [J]. TAILOR MADE CONCRETE STRUCTURES: NEW SOLUTIONS FOR OUR SOCIETY, 2008, : 162 - 162
- [27] ACCELERATED BRIDGE CONSTRUCTION (ABC) AND SEISMIC DAMAGE RESISTANT TECHNOLOGY: A NEW ZEALAND CHALLENGE [J]. BULLETIN OF THE NEW ZEALAND SOCIETY FOR EARTHQUAKE ENGINEERING, 2012, 45 (03): : 123 - 134
- [28] Multi-Criteria Evaluation Framework in Selection of Accelerated Bridge Construction (ABC) Method [J]. SUSTAINABILITY, 2018, 10 (11):
- [29] Simplified full-depth precast concrete deck panel systems for accelerated bridge construction [J]. JOURNAL OF MODERN TRANSPORTATION, 2016, 24 (04): : 251 - 260