INTERACTION, PRACTICES AND DEVELOPMENT OF ACCELERATED BRIDGE CONSTRUCTION (ABC) IN DECK AND GIRDER

被引:0
|
作者
Gautam, Bishnu Gupt [1 ]
Xiang, Yiqiang [2 ]
机构
[1] Zhejiang Univ, Dept Civil Engn, Hangzhou 310058, Zhejiang, Peoples R China
[2] Zhejiang Univ, Dept Civil Engn, HZ-310058 Hangzhou, Zhejiang, Peoples R China
关键词
accelerated bridge construction; ultra high performance concrete; carbon- fiber-reinforced polymer; PRECAST CONCRETE PANELS; FULL; PERFORMANCE;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper is focused on review on development of technology and strengthening techniques of different part of Bridge by using Accelerated Bridge Construction (ABC). With the advent of high-capacity machinery, new materials, new technologies and new management methods, we are now able to manufacture bridge assemblies and lifting them in position. The new structures can be described as the application of Accelerated construction, Rapid construction, Modular construction, Mechanized construction or Ready-made construction. The goal of ABC is to open a cost effective, long-lasting bridge to traffic with increased safety and reduced traffic disruption in a shortened construction period. Accelerated bridge construction majorly uses steel-concrete composite bridges with full depth precast decks which has two types of connections, shear connection between steel girder and precast deck, and transverse joint between precast panels. Longitudinal prestress is applied to prevent crack and water leakage to transverse joints, which otherwise would decrease the life of the bridge considerably. The post-tensioned connection currently used is effective in strengthening the transverse joint, but once this post-tensioning system is installed it makes it very difficult to replace individual deck sections that begin to fail. By proposing and evaluating the curved-bolt connection, which make the necessary posttensioning as well as make the deck replacement possible. Although the information presented in this paper is related to numerical as well as practical study.
引用
收藏
页码:1576 / 1582
页数:7
相关论文
共 50 条
  • [21] Analysis on the Sensitivity of Structure in Girder Steel Bridge Deck Pavement
    Zhang, DeJia
    Ye, Fen
    Jiang, GuoJie
    Wu, JinTing
    [J]. ADVANCED RESEARCH ON ADVANCED STRUCTURE, MATERIALS AND ENGINEERING, 2012, 382 : 466 - +
  • [22] Damage detection of coupled bridge deck-girder system
    Roy, S.
    Chakraborty, S.
    Sarkar, S. K.
    [J]. FINITE ELEMENTS IN ANALYSIS AND DESIGN, 2006, 42 (11) : 942 - 949
  • [23] Composite action between girder and bridge deck with precast panels
    Burns, NH
    [J]. PCI JOURNAL, 2001, 46 (01): : 85 - 85
  • [24] Modular pedestrian bridge with concrete deck and IPC truss girder
    De Roover, C
    Vantomme, J
    Wastiels, J
    Croes, K
    Taerwe, L
    Blontrock, H
    [J]. ENGINEERING STRUCTURES, 2003, 25 (04) : 449 - 459
  • [25] Girder bridge as a steel bound construction
    不详
    [J]. BAUINGENIEUR, 2009, 84 : A20 - A21
  • [26] Design and construction of open deck bridge
    Abo, T.
    Ooba, M.
    Yoda, S.
    Suzuki, S.
    [J]. TAILOR MADE CONCRETE STRUCTURES: NEW SOLUTIONS FOR OUR SOCIETY, 2008, : 162 - 162
  • [27] ACCELERATED BRIDGE CONSTRUCTION (ABC) AND SEISMIC DAMAGE RESISTANT TECHNOLOGY: A NEW ZEALAND CHALLENGE
    Palermo, Alessandro
    Mashal, Mustafa
    [J]. BULLETIN OF THE NEW ZEALAND SOCIETY FOR EARTHQUAKE ENGINEERING, 2012, 45 (03): : 123 - 134
  • [28] Multi-Criteria Evaluation Framework in Selection of Accelerated Bridge Construction (ABC) Method
    Jia, Jianmin
    Ibrahim, Mohamed
    Hadi, Mohammed
    Orabi, Wallied
    Xiao, Yan
    [J]. SUSTAINABILITY, 2018, 10 (11):
  • [29] Simplified full-depth precast concrete deck panel systems for accelerated bridge construction
    Ma, Zhongguo John
    Zhan, Yulin
    Xiao, Lin
    Li, Lungui
    Lu, Weiwei
    [J]. JOURNAL OF MODERN TRANSPORTATION, 2016, 24 (04): : 251 - 260
  • [30] Bridge Deck Rehabilitation Practices in North America
    Lachemi, M.
    Hossain, K. M. A.
    Ramcharitar, M.
    Shehata, M.
    [J]. JOURNAL OF INFRASTRUCTURE SYSTEMS, 2007, 13 (03) : 225 - 234