An integrated production batch planning approach for steelmaking-continuous casting with cast batching plan as the core

被引:7
|
作者
Wang, Yong-Zhou [1 ]
Zheng, Zhong [1 ,3 ]
Zhu, Ming-Mei [1 ]
Zhang, Kai -Tian [1 ]
Gao, Xiao-Qiang [2 ]
机构
[1] Chongqing Univ, Coll Mat Sci & Engn, Chongqing 400045, Peoples R China
[2] Chongqing Univ, Sch Econ & Business Adm, Chongqing 400045, Peoples R China
[3] Chongqing Univ, Coll Mat Sci & Engn, 174 Shazheng St, Chongqing, Peoples R China
基金
中国国家自然科学基金;
关键词
Steelmaking -continuous casting; Production batching plan; Multi -cast batching plan; Integrated approach; Improved NSGA-II; OPTIMIZATION ALGORITHM; LAGRANGIAN-RELAXATION; COLUMN GENERATION; SYSTEM;
D O I
10.1016/j.cie.2022.108636
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The development of the high-efficiency continuous casting technology makes it possible to continuously cast with multi-cast batching plans. The preparation of such steelmaking-continuous casting (SCC) production batching plan has become a new requirement to promote the efficient steel production. From the perspective of overall production system, an integrated approach with the cast batching plan as the core was proposed, which changes the step-by-step optimization way of combination and sequencing for preparing charge batching plan and cast batching plan sequentially. This approach, which can perform integrated combination and sequencing, directly prepares the SCC production batching plan with multiple cast batching plans that can be continuously cast, and takes into account the charge batching plans. Taking minimizing the weight of unplanned slabs, maximizing the production efficiency of continuous casters, and minimizing the penalty value for the change of dimensions of the adjacent slabs as the objectives, a multi-objective mixed-integer programming model was established. An improved NSGA-II combined with a local search strategy was designed, and the practical aspects such as multiple grades continuous casting rules and on-line width adjustable rules were considered. The test result with data from a steel plant in China indicated that the improved algorithm could obtain better slab combination sequence results compared with the NSGA-II and SPEA2. Simultaneously, compared with the manual approach and the traditional approach of preparing the charge batching plan and cast batching plan sequentially, the integrated approach can not only reduce the residual material rate by 4.96% and 0.42%, improve the quality of the solution, but also improve the efficiency of planning.
引用
收藏
页数:12
相关论文
共 50 条
  • [31] An improved Lagrangian relaxation approach to scheduling steelmaking-continuous casting process
    Cui, Haijuan
    Luo, Xiaochuan
    COMPUTERS & CHEMICAL ENGINEERING, 2017, 106 : 133 - 146
  • [32] UML-based modeling for steelmaking-continuous casting production scheduling system
    Li, TK
    Liu, W
    Wang, J
    7TH WORLD MULTICONFERENCE ON SYSTEMICS, CYBERNETICS AND INFORMATICS, VOL XVI, PROCEEDINGS: SYSTEMICS AND INFORMATION SYSTEMS, TECHNOLOGIES AND APPLICATION, 2003, : 48 - 52
  • [33] Optimal model on integrated production planning and scheduling of steelmaking and continuous casting process
    Zheng, Zhong
    Liu, Hai-Yu
    Gao, Xiao-Qiang
    He, La-Mei
    Zhang, Tao
    Chen, Kai
    Chongqing Daxue Xuebao/Journal of Chongqing University, 2010, 33 (03): : 108 - 113
  • [34] Robust dynamic scheduling with uncertain release time for the steelmaking-continuous casting production
    Long, Jianyu
    Sun, Zhenzhong
    Hong, Ying
    Bai, Yun
    2018 INTERNATIONAL CONFERENCE ON SENSING, DIAGNOSTICS, PROGNOSTICS, AND CONTROL (SDPC), 2018, : 531 - 536
  • [35] A two-stage robust optimization approach for steelmaking-continuous casting production scheduling under uncertainty
    Jiang S.-L.
    Wen Y.-M.
    Chen L.
    Cao L.-L.
    Peng G.-Z.
    Kongzhi yu Juece/Control and Decision, 2023, 38 (12): : 3516 - 3524
  • [36] Many-objective harmony search for integrated order planning in steelmaking-continuous casting-hot rolling production of multi-plants
    Lin, Jianhua
    Liu, Min
    Hao, Jinghua
    Gu, Peng
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2017, 55 (14) : 4003 - 4020
  • [37] Flexible scheduling approach for steelmaking-continuous casting process with uncertain processing times
    Jiang S.
    Zheng Z.
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (01): : 103 - 114
  • [38] A robust dynamic scheduling approach based on release time series forecasting for the steelmaking-continuous casting production
    Long, Jianyu
    Sun, Zhenzhong
    Pardalos, Panos M.
    Bai, Yun
    Zhang, Shaohui
    Li, Chuan
    APPLIED SOFT COMPUTING, 2020, 92
  • [39] Decision support system for the batching problems of steelmaking and continuous-casting production
    Tang, Lixin
    Wang, Gongshu
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2008, 36 (06): : 976 - 991
  • [40] Application of Mix Optimization Scheduling Approach for Steelmaking-Continuous Casting Process Based on Actual Steelmaking Industry
    Liang-liang Sun
    Xiu-ying Wang
    Journal of Iron and Steel Research International, 2013, 20 : 1 - 9