ASSESSMENT AND MANAGEMENT OF AGEING OF CIVIL STRUCTURES OF PAKS NPP

被引:0
|
作者
Katona, Tamas
Ratkai, Sandor
Gosi, Peter
Moga, Istvan
机构
关键词
D O I
暂无
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
Ageing management review is an essential element of the licence renewal process. Proper ageing management has to ensure that ageing effects will be discovered and handled before the loss of the intended functions of the structures. This practice, the most important and the most frequent degradation mechanisms and effects with the involved concrete structures and structural elements, are presented and summarised in this paper. Two types of ageing management programmes are applied at Paks NPP. Programmes "A" are related to the different structural elements of the buildings or to typical ageing problems (e.g., settlement) which occur at many buildings. Programmes "B" specify the exact methods and conditions of the application of the necessary "A" programmes for the different buildings. Altogether 31 buildings are involved in the ageing management system of Paks NPP. The majority of the identified degradation problems were comparatively minor and involved mainly concrete cracking, leaching, chemical attack, corrosion of carbon steel liners, degradation of sealing and coating materials, and settlement. The main results of monitoring and theoretical analyses (in the fields of heavy-concrete structures, effect of elevated temperature, forecasting of settlement for the end of the extended lifetime, etc.) are also presented.
引用
收藏
页码:509 / 520
页数:12
相关论文
共 50 条
  • [41] Reactor Dosimetry Aspects of the Service Life Extension of the Hungarian Paks NPP
    Zsolnay, Eva M.
    Czifrus, Szabolcs
    Feher, Sandor
    Hordosy, Gabor
    Kereszturi, Andras
    Kresz, Norbert
    Oszvald, Ferenc
    ISRD 15 - INTERNATIONAL SYMPOSIUM ON REACTOR DOSIMETRY, 2016, 106
  • [42] Identification and dynamic inversion-based control of a pressurizer at the Paks NPP
    Szabo, Zoltan
    Szederkenyi, Gabor
    Gaspar, Peter
    Varga, Istvan
    Hangos, Katalin M.
    Bokor, Jozsef
    CONTROL ENGINEERING PRACTICE, 2010, 18 (05) : 554 - 565
  • [43] AN EXPERT SYSTEM APPROACH TO THE DEVELOPMENT OF NOISE DIAGNOSTIC SYSTEM IN NPP PAKS
    KEVICZKY, L
    BOKOR, J
    NAGY, I
    VERES, S
    PROGRESS IN NUCLEAR ENERGY, 1988, 21 : 223 - 227
  • [44] Main results of a level 2 PSA study completed for Paks NPP
    Elter, J
    Gado, J
    Hollo, E
    PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOL 1- 6, 2004, : 284 - 289
  • [45] Pain assessment and management in ageing
    不详
    JOURNAL OF ADVANCED NURSING, 2005, 49 (05) : 558 - 558
  • [46] ASSESSMENT OF AGEING STRUCTURES CASE STUDIES
    Landet, Einar
    Oma, Narve
    Ersdal, Gerhard
    Sigurdsson, Gudfinnur
    Sorensen, Trond
    OMAE2011: PROCEEDINGS OF THE ASME 30TH INTERNATIONAL CONFERENCE ON OCEAN, OFFSHORE AND ARCTIC ENGINEERING, VOL 3: MATERIALS TECHNOLOGY, 2011, : 487 - +
  • [47] Continuous analysis of radioactive iodine isotopes in the primary coolant of NPP, Paks, Hungary
    Erdos, E
    Soos, J
    Pinter, T
    Vincze, A
    Gujgiczer, A
    Zsille, O
    Solymosi, J
    Nagy, LG
    ACH-MODELS IN CHEMISTRY, 1997, 134 (2-3): : 337 - 342
  • [48] 2F-LBLOCA Analyses for the Paks NPP With the System Code ATHLET
    Gyoeri, C.
    Trosztel, I.
    Horche, W.
    Simulation Councils Proceedings Series, 1995, 27 (03):
  • [49] AN ASSESSMENT METHODOLOGY FOR CIVIL AGEING MANAGEMENT AND CONCRETE FOR LTO/CSO BASED ON INTERNATIONAL STANDARDS AND ENGINEERING JUDGEMENT
    de Haan-de Wilde, F. H. E.
    de Bont, C. G. M.
    PROCEEDINGS OF THE ASME 2020 PRESSURE VESSELS & PIPING CONFERENCE (PVP2020), VOL 8, 2020,
  • [50] AN UPDATE OF THE ASSESSMENT METHODOLOGY FOR CIVIL AGEING MANAGEMENT FOR LTO/CSO BASED ON INTERNATIONAL STANDARDS AND ENGINEERING JUDGEMENT
    de Haan-de Wilde, F. H. E.
    Janssen, M. J.
    PROCEEDINGS OF ASME 2021 PRESSURE VESSELS AND PIPING CONFERENCE (PVP2021), VOL 5, 2021,