An application of Branch and Cut to open pit mine scheduling

被引:170
|
作者
Caccetta, L [1 ]
Hill, SP [1 ]
机构
[1] Curtin Univ Technol, Sch Math & Stat, Perth, WA 6845, Australia
关键词
Branch and Cut; mixed integer linear programming; mine scheduling; optimization;
D O I
10.1023/A:1024835022186
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
The economic viability of the modern day mine is highly dependent upon careful planning and management. Declining trends in average ore grades, increasing mining costs and environmental considerations will ensure that this situation will remain in the foreseeable future. The operation and management of a large open pit mine having a life of several years is an enormous and complex task. Though a number of optimization techniques have been successfully applied to resolve some important problems, the problem of determining an optimal production schedule over the life of the deposit is still very much unresolved. In this paper we will critically examine the techniques that are being used in the mining industry for production scheduling indicating their limitations. In addition, we present a mixed integer linear programming model for the scheduling problems along with a Branch and Cut solution strategy. Computational results for practical sized problems are discussed.
引用
收藏
页码:349 / 365
页数:17
相关论文
共 50 条
  • [41] "Put your feet in open pit" - a WebXR Unity application for learning about the technological processes in the open pit mine
    Pomykala, Radoslaw
    Patyk, Michal
    Sikora, Mateusz
    Cybulski, Artur
    Boniecka, Julia
    Juszczak, Jakub
    Klatka, Tadeusz
    Kedzierski, Maciej
    Igras-Cybulska, Magdalena
    [J]. 2022 IEEE CONFERENCE ON VIRTUAL REALITY AND 3D USER INTERFACES ABSTRACTS AND WORKSHOPS (VRW 2022), 2022, : 484 - 487
  • [42] Engineered open pit mine backfilling
    Sevick, GW
    Hutchison, JB
    Murphy, J
    Chapman, JT
    [J]. TAILINGS AND MINE WASTE '98, 1998, : 45 - 54
  • [43] NACIMIENTO OPEN PIT COPPER MINE
    KRAUSSE, DM
    HALL, WB
    [J]. MINING CONGRESS JOURNAL, 1971, 57 (11): : 75 - &
  • [44] Swelling rocks in an open pit mine
    Bilir, M. E.
    Aydingun, E.
    [J]. ROCK MECHANICS FOR RESOURCES, ENERGY AND ENVIRONMENT, 2013, : 647 - 651
  • [46] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    [J]. Geotechnical and Geological Engineering, 2019, 37 : 3367 - 3378
  • [47] The Influence of Rainfall on Landslide Stability of an Open-Pit Mine: The Case of Haizhou Open-Pit Mine
    An Bo
    Zhu Chun
    Liu Kuiming
    Li Sitong
    Tao Zhigang
    Li Haipeng
    Yu Haoran
    [J]. GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2019, 37 (04) : 3367 - 3378
  • [48] Application of Mining Width-Constrained Open Pit Mine Production Scheduling Problem to the Medium-Term Planning of Radomiro Tomic Mine: A Case Study
    Juan L. Yarmuch
    Gonzalo Sepulveda
    [J]. Mining, Metallurgy & Exploration, 2024, 41 : 681 - 693
  • [49] Application of Mining Width-Constrained Open Pit Mine Production Scheduling Problem to the Medium-Term Planning of Radomiro Tomic Mine: A Case Study
    Yarmuch, Juan L.
    Sepulveda, Gonzalo
    [J]. MINING METALLURGY & EXPLORATION, 2024, 41 (02) : 681 - 693
  • [50] Application of O.R. in optimization of open pit mine loading and transportation
    Fatemi, Ghomi, M.T.
    Sakkaki, S.H.
    [J]. Amirkabir (Journal of Science and Technology), 1994, 7 (25):