共 50 条
- [41] Comparison of different techniques for measuring the cable tension of a cable-stayed bridge during the tensioning process [J]. MAINTENANCE, MONITORING, SAFETY, RISK AND RESILIENCE OF BRIDGES AND BRIDGE NETWORKS, 2016, : 554 - 554
- [44] A Research to Cable Force Optimizing Calculation of Cable-stayed Arch Bridge [J]. SECOND SREE CONFERENCE ON ENGINEERING MODELLING AND SIMULATION (CEMS 2012), 2012, 37 : 155 - 160
- [45] OPTIMUM CABLE-FORCE ADJUSTMENTS IN CONCRETE CABLE-STAYED BRIDGES [J]. JOURNAL OF STRUCTURAL ENGINEERING-ASCE, 1995, 121 (04): : 685 - 694
- [48] Optimization of cables size and prestressing force for a single pylon cable-stayed bridge with Jaya algorithm [J]. STEEL AND COMPOSITE STRUCTURES, 2020, 34 (06): : 853 - 862
- [49] Optimization of Cable Force for Single Tower Cable-Stayed Bridge Without Back Cable Based on Influence Matrix Method [J]. PROCEEDINGS OF THE SECOND INTERNATIONAL CONFERENCE ON MODELLING AND SIMULATION (ICMS2009), VOL 4, 2009, : 528 - 531