摘要
In recent years, Ultra supercritical power plant boiler in China is developing very rapidly, therefore,using the RBI risk evaluation method to carry out inspection of large power station boiler is very necessary. Operation practice shows that the membrane type water-wall is one of the main risk parts of large power plant boiler. Research has shown that typical failure area of membrane type water-wall is layer nearby the burner; Most of failure positions are in high heat flux region, the fins weld joint; Failure mechanism is comprehensive factors,such as,the welding deformation, weld defects and fins weld crack, foreign bodies blocked, blowing loss thinning, short-term over temperature overheating. On this basis, the application of RBI risk assessment method, analyzed the risk level and failure consequences of a power plant boiler membrane type water wall, the risk matrix is obtained, proposed the,corresponding test strategy, for the RBI technology application to evaluation of power plant boiler components provides a new method of failure risk.
引用
收藏
页数:5
相关论文
共 50 条
  • [31] Risk-based inspection - The needs, benefits and approach for power and process plants
    Cane, BJ
    Browne, RJ
    LIFETIME MANAGEMENT AND EVALUATION OF PLANT, STRUCTURES AND COMPONENTS, 1998, : 461 - 476
  • [32] Failure Analysis of Boiler Water Wall Tube: A Case Study from Thermal Power Plant
    Ghosh, Debashis
    Roy, Himadri
    Saha, Atanu
    Subramanian, Chidambaram
    JOURNAL OF FAILURE ANALYSIS AND PREVENTION, 2022, 22 (01) : 203 - 208
  • [33] Failure Analysis of Boiler Water Wall Tube: A Case Study from Thermal Power Plant
    Debashis Ghosh
    Himadri Roy
    Atanu Saha
    Chidambaram Subramanian
    Journal of Failure Analysis and Prevention, 2022, 22 : 203 - 208
  • [34] Risk-based prioritization of water main failure using fuzzy synthetic evaluation technique
    Al-Zahrani, Muhammad
    Abo-Monasar, Amin
    Sadiq, Rehan
    JOURNAL OF WATER SUPPLY RESEARCH AND TECHNOLOGY-AQUA, 2016, 65 (02): : 145 - 161
  • [35] Results of the evaluation of food chain information for a risk-based meat inspection
    Windhaus, A.
    Meemken, D.
    Blaha, T.
    Klein, G.
    DEUTSCHE TIERARZTLICHE WOCHENSCHRIFT, 2007, 114 (08): : 305 - 308
  • [36] Performance Evaluation of a Risk-based Three-tier Inspection System
    Wang, Chia-Hung
    Lan, Jinman
    2017 2ND INTERNATIONAL CONFERENCE ON COMPUTATIONAL MODELING, SIMULATION AND APPLIED MATHEMATICS (CMSAM), 2017, : 464 - 468
  • [37] Failure Analysis of α-MDEA Air-Cooled Heat Exchanger of CO2 Removal Unit Based on the Semiquantitative Risk-Based Inspection Method
    Lashgari, Hamid Reza
    Hanaei, Amir
    Adeli, A. R.
    JOURNAL OF PRESSURE VESSEL TECHNOLOGY-TRANSACTIONS OF THE ASME, 2014, 136 (02):
  • [38] Risk-based maintenance (RBM): A new approach for process plant inspection and maintenance
    Khan, FI
    Haddara, M
    PROCESS SAFETY PROGRESS, 2004, 23 (04) : 252 - 265
  • [39] Identification of water-cooled wall ash accumulation based on AWGAM-YOLOv8n
    Hao, Yongxing
    Wang, Bin
    Hao, Yilong
    Cao, Angang
    SCIENTIFIC REPORTS, 2024, 14 (01):
  • [40] Experience from use of risk-based methods in inspection and maintenance of power plants
    Bareiss, JM
    Jovanovic, AS
    Balos, D
    Perunicic, M
    BALTICA VI: LIFE MANAGEMENT AND MAINTENANCE FOR POWER PLANTS, VOL 1 AND 2, 2004, 233-234 : 31 - 41