Reliability Analysis of Cyber-Enabled Power Distribution System Using Sequential Monte-Carlo

被引:0
|
作者
Heidari-Kapourchali, Mohammad [1 ]
Sepehry, Mojtaba [1 ]
Zhao, Long [1 ]
Aravinthan, Visvakumar [1 ]
机构
[1] Wichita State Univ, Dept Elect Engn & Comp Sci, Wichita, KS 67260 USA
关键词
Cyber-Enabled technologies; Energy not Supplied; Sequential Monte Carlo;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Cyber-enabled power system places higher requirements on the reliability of communication infrastructure. This paper proposes an approach to calculate reliability of distribution networks in the presence of communication media. Communication failure is incorporated into sequential Monte Carlo simulation using a uniform probability distribution function. A straightforward matrix representation is developed to analyze the impact of fault on each load point. Several scenarios are discussed to illustrate the impact of potential communication failures. For each scenario energy not supplied is calculated for Bus 2 of RBTS. The results show the necessity of evolving well-established reliability calculation methods.
引用
收藏
页数:6
相关论文
共 50 条
  • [31] Bayesian Estimation of System Reliability Models Using Monte-Carlo Technique of Simulation
    Kirti Arekar
    Rinku Jain
    Surender Kumar
    Journal of Statistical Theory and Applications, 2021, 20 : 149 - 163
  • [32] Water Quality Reliability Analysis of Water Distribution Systems Based on Monte-Carlo Simulation
    Li, Xia
    Sun, Ying
    Han, Xiao
    Zhao, Xinhua
    ENVIRONMENTAL BIOTECHNOLOGY AND MATERIALS ENGINEERING (2013), 2013, 777 : 401 - +
  • [33] Reliability cost assessment of power transmission networks using the Monte-Carlo simulation approach
    Dialynas, EN
    Megalokonomos, SM
    Agoris, D
    DRPT2000: INTERNATIONAL CONFERENCE ON ELECTRIC UTILITY DEREGULATION AND RESTRUCTURING AND POWER TECHNOLOGIES, PROCEEDINGS, 2000, : 596 - 601
  • [34] Develop an intelligent equipment maintenance system using cyber-enabled JESS technology
    Yao, YH
    Trappey, AJC
    Ku, CC
    Lin, GYP
    Tsais, JP
    Ho, PS
    Hung, B
    2005 IEEE International Conference on Mechatronics, 2005, : 927 - 932
  • [35] Reliability Compliant Distribution System Planning Using Monte Carlo Simulation
    Battu, Neelakanteshwar Rao
    Abhyankar, Abhijit R.
    Senroy, Nilanjan
    ELECTRIC POWER COMPONENTS AND SYSTEMS, 2019, 47 (11-12) : 985 - 997
  • [36] Analysis on differences of applying sequential Monte Carlo methods in power gird reliability assessment
    Bao, Yingkai
    Wang, Yue
    Tang, Junxi
    Guo, Chuangxin
    Wang, Xing
    Shi, Hui
    Dianwang Jishu/Power System Technology, 2014, 38 (05): : 1189 - 1195
  • [37] Teaching distribution system reliability evaluation using Monte Carlo simulation
    Billinton, R
    Wang, P
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1999, 14 (02) : 397 - 403
  • [38] USING A SEQUENTIAL APPROXIMATION TO A PERMUTATION TEST IN MONTE-CARLO SIMULATIONS
    LOCK, RH
    AMERICAN STATISTICAL ASSOCIATION 1988 PROCEEDINGS OF THE STATISTICAL COMPUTING SECTION, 1988, : 368 - 372
  • [39] A MONTE-CARLO METHOD FOR MULTIAREA GENERATION SYSTEM RELIABILITY ASSESSMENT
    BILLINTON, R
    LI, W
    IEEE TRANSACTIONS ON POWER SYSTEMS, 1992, 7 (04) : 1487 - 1492