Increasing Short-Term Output in Assembly Work

被引:6
|
作者
de Looze, Michiel P. [1 ,2 ]
Bosch, T. [1 ]
van Rhijn, J. W. [1 ]
机构
[1] TNO, TNO Qual Life, NL-2130 AS Hoofddorp, Netherlands
[2] Vrije Univ Amsterdam, Amsterdam, Netherlands
关键词
Manual assembly; Work/rest; Productivity; Discomfort; DATA-ENTRY OPERATORS; REST BREAKS; COMPUTER-WORK; PRODUCTIVITY;
D O I
10.1002/hfm.20199
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Maximization of flexibility is one of the major challenges in assembly line design. This article addresses the question of how to temporarily (in times of peak demand) increase the output of a line, which is already optimized to attain the "normal" output rate. Instead of a costly reconfiguration of the line creating extra workstations for more operators, we applied an approach of keeping the line intact, adding two extra operators, and applying a scheme wherein the operators took their breaks alternately. For two different alternating break schemes, we compared the productivity rates, the physical load on operators, and the operators' experiences to those of the traditional situation. The new approach resulted in an increase in line output of 12-16%, depending on which alternating break scheme was applied. On the operator level, we observed no differences in productivity among conditions, despite the differences in total pause time per operator. Simultaneously, physical loads on the neck and shoulders, expressed by level of discomfort, were found to be significantly lower in one of the new alternating break schemes. A majority of the operators rated this alternating break scheme as "pleasant" (90%), but wanted the scheme to be applied only during the periods of peak demand because of social aspects (80%). In conclusion, an increase in volume flexibility can be achieved by adding two extra workers and applying an alternating work/rest scheme without a costly reconfiguration of the line. (C) 2010 Wiley Periodicals, Inc.
引用
收藏
页码:470 / 477
页数:8
相关论文
共 50 条
  • [31] SHORT-TERM MEASUREMENTS OF TOXIC SUBSTANCES AT WORK SITE
    RASCHDORF, F
    CHIMIA, 1978, 32 (12) : 478 - 483
  • [32] Measuring Traffic in Short-Term Construction Work Zones
    Bathula, Manohar
    Ramezanali, Mehrdad
    Pradhan, Ishu
    Patel, Nilesh
    Gotschall, Joe
    Sridhar, Nigamanth
    2009 INTERNATIONAL CONFERENCE ON INFORMATION PROCESSING IN SENSOR NETWORKS (IPSN 2009), 2009, : 361 - 362
  • [33] Assessment of peak power and short-term work capacity
    Brian R. MacIntosh
    Peter Rishaug
    Krista Svedahl
    European Journal of Applied Physiology, 2003, 88 : 572 - 579
  • [34] Fatigue and optimal conditions for short-term work capacity
    MacIntosh, BR
    Svedahl, K
    Kim, M
    EUROPEAN JOURNAL OF APPLIED PHYSIOLOGY, 2004, 92 (4-5) : 369 - 375
  • [35] IMPACT OF PHYSICAL LOAD ON SHORT-TERM WORK ACTIVITY
    BRICHACEK, V
    CESKOSLOVENSKA PSYCHOLOGIE, 1967, 11 (03): : 232 - 242
  • [36] )) INFLUENCE OF SHORT-TERM PHYSICAL WORK ON BLOOD CLOTTING
    BIELSKI, J
    ZYSKOWSKI, Z
    ACTA PHYSIOLOGICA POLONICA, 1968, 19 (06): : 889 - +
  • [37] Assessment of peak power and short-term work capacity
    MacIntosh, BR
    Rishaug, P
    Svedahl, K
    EUROPEAN JOURNAL OF APPLIED PHYSIOLOGY, 2003, 88 (06) : 572 - 579
  • [38] FLEXIBLE WORK ORGANIZATION FOR SHORT-TERM PRODUCTION CONTROL
    WARNECKE, HJ
    SCHEIBER, RE
    WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1982, 72 (07): : 381 - 384
  • [39] Fatigue and optimal conditions for short-term work capacity
    Brian R. MacIntosh
    Krista Svedahl
    Minhan Kim
    European Journal of Applied Physiology, 2004, 92 : 369 - 375
  • [40] LEARNING FOR WORK - SHORT-TERM GAIN OR LONG-TERM BENEFIT
    LEE, M
    PERSONNEL REVIEW, 1995, 24 (06) : 29 - &