Increasing Short-Term Output in Assembly Work

被引:6
|
作者
de Looze, Michiel P. [1 ,2 ]
Bosch, T. [1 ]
van Rhijn, J. W. [1 ]
机构
[1] TNO, TNO Qual Life, NL-2130 AS Hoofddorp, Netherlands
[2] Vrije Univ Amsterdam, Amsterdam, Netherlands
关键词
Manual assembly; Work/rest; Productivity; Discomfort; DATA-ENTRY OPERATORS; REST BREAKS; COMPUTER-WORK; PRODUCTIVITY;
D O I
10.1002/hfm.20199
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Maximization of flexibility is one of the major challenges in assembly line design. This article addresses the question of how to temporarily (in times of peak demand) increase the output of a line, which is already optimized to attain the "normal" output rate. Instead of a costly reconfiguration of the line creating extra workstations for more operators, we applied an approach of keeping the line intact, adding two extra operators, and applying a scheme wherein the operators took their breaks alternately. For two different alternating break schemes, we compared the productivity rates, the physical load on operators, and the operators' experiences to those of the traditional situation. The new approach resulted in an increase in line output of 12-16%, depending on which alternating break scheme was applied. On the operator level, we observed no differences in productivity among conditions, despite the differences in total pause time per operator. Simultaneously, physical loads on the neck and shoulders, expressed by level of discomfort, were found to be significantly lower in one of the new alternating break schemes. A majority of the operators rated this alternating break scheme as "pleasant" (90%), but wanted the scheme to be applied only during the periods of peak demand because of social aspects (80%). In conclusion, an increase in volume flexibility can be achieved by adding two extra workers and applying an alternating work/rest scheme without a costly reconfiguration of the line. (C) 2010 Wiley Periodicals, Inc.
引用
收藏
页码:470 / 477
页数:8
相关论文
共 50 条
  • [1] Short-term forecast of interindustry output
    Arkhangelskii Y.S.
    Studies on Russian Economic Development, 2012, 23 (2) : 208 - 210
  • [2] MAXIMAL SHORT-TERM POWER OUTPUT IN HUMANS
    SARGEANT, AJ
    JOURNAL OF PHYSIOLOGY-LONDON, 1990, 429 : P57 - P57
  • [3] INPUT-OUTPUT SHORT-TERM STORAGE
    BUSCHKE, H
    JOURNAL OF VERBAL LEARNING AND VERBAL BEHAVIOR, 1968, 7 (05): : 900 - &
  • [4] Short-Term Effects of Short-Term Work Dynamics in Fatigue Across Two National Lockdowns
    Rauvola, Rachel S.
    Rudolph, Cort W.
    Zacher, Hannes
    JOURNAL OF OCCUPATIONAL AND ENVIRONMENTAL MEDICINE, 2022, 64 (07) : 550 - 556
  • [5] ON THE STRUCTURAL SENSITIVITY OF SHORT-TERM OUTPUT INFLATION TRADEOFFS
    SPENCER, GH
    DUGGAN, KG
    APPLIED ECONOMICS, 1984, 16 (01) : 81 - 98
  • [6] The cost of mitigating short-term PV output variability
    Perez, Richard
    Hoff, Thomas
    Dise, John
    Chalmers, David
    Kivalov, Sergey
    2013 ISES SOLAR WORLD CONGRESS, 2014, 57 : 755 - +
  • [7] INPUT AND OUTPUT INTERFERENCE IN SHORT-TERM ASSOCIATIVE MEMORY
    TULVING, E
    ARBUCKLE, TY
    JOURNAL OF EXPERIMENTAL PSYCHOLOGY, 1966, 72 (01): : 145 - &
  • [8] Short-term power output forecasting of the photovoltaics in Bulgaria
    Kolev, Valentin
    Sulakov, Stefan
    2018 10TH ELECTRICAL ENGINEERING FACULTY CONFERENCE (BULEF), 2018,
  • [9] Short-term treatment and social work practice
    Kadushin, G
    FAMILIES IN SOCIETY-THE JOURNAL OF CONTEMPORARY HUMAN SERVICES, 2000, 81 (03): : 340 - 342
  • [10] Optimization of work parameters of a short-term autoleveller
    Idzik, Marek
    2000, Sciendo (08):