摘要
York Region (the Region) is one of the fastest growing communities in the Greater Toronto Area. It operates a "two tier" level of government, taking responsibility for the large diameter trunk water mains and sewers serving the population. The lower tier municipalities take responsibility for local distribution and collection systems. The Region owns and operates approximately 350 km of large diameter watermains which transport water from treatment facilities to the local distribution system. The pipe material inventory is predominantly concrete pressure pipe (AWWA C301) at 83%, with the next largest material group being ductile iron (DI) at 9% and PVC & HDPE make up 7% of the inventory. The system is relatively young in age, with 72% of its entire inventory being less than 20 years of age, and 27% being 20 to 40 years of age. The diameter of the Region's watermain inventory ranges from 1800 to 400 mm with an average diameter of approximately 750 mm. After early adoption of field investigations of concrete pressure pipes using leading edge condition assessment technologies including wet, live deployed electromagnetic inspection technologies along with confirmatory forensic exhumations, the Region took a step back to evaluate the effectiveness of its tactic and subsequently determined to take a more strategic, risk-based and holistic approach to its watermain asset management. The Region also collaborated with other municipalities in North America to identify industry best practices. A gap analysis was then undertaken to identify a road map of actions and timeframes to better target future condition assessment activities. It was determined that a few key exercises are best to be completed in advance of field works. As a summary those tasks include: sorting watermain in descending priority sequence according to risk, to think through the potential results of condition assessment and subsequent resulting actions in advance of the field works and to better plan and prepare for contingencies and probable outcomes. By better understanding the inspection and condition assessment tools and their suitable uses and likely results, the Region has a clearer and more fulsome understanding of how to manage risk while sustaining this critical infrastructure at the lowest overall lifecycle cost.
引用
收藏
页码:348 / 359
页数:12
相关论文
共 50 条
  • [21] INFORMATION ASSET MANAGEMENT
    APPLETON, DS
    DATAMATION, 1986, 32 (03): : 71 - &
  • [22] Reserves/asset management
    Ryder Scott Company, Canada
    不详
    JPT J Pet Technol, 2008, 12 (58):
  • [23] Reserves/asset management
    Horton, Greg
    Pribyl, Barbara
    JPT, Journal of Petroleum Technology, 2015, 67 (12):
  • [24] Brand asset management
    Troy, LC
    JOURNAL OF THE ACADEMY OF MARKETING SCIENCE, 2002, 30 (03) : 269 - 270
  • [25] The asset management BANDWAGON
    Maine Rural Water Asseclation, United States
    Water Wastes Dig, 2008, 11 (39):
  • [26] THE ROLE OF ASSET MANAGEMENT
    BRITTON, RJ
    RUMSEY, PB
    JOURNAL OF THE INSTITUTION OF WATER AND ENVIRONMENTAL MANAGEMENT, 1990, 4 (03): : 251 - 255
  • [27] Asset Management Transformed
    Yokoi, Hiroshi
    InTech, 2021, 68 (02)
  • [28] Colliery asset management
    Houghton, M.D.
    Mining Technology, 1991, 73 (842): : 44 - 47
  • [29] The asset management box
    Müller, J.
    Uecker, F.
    Wollschlaeger, M.
    Diedrich, Ch.
    Epple, U.
    IEE Computing and Control Engineering, 2003, 14 (01): : 34 - 39
  • [30] The art of asset management
    Hebert, Dan
    Boyes, Walt
    Control (Chicago, Ill), 2004, 17 (11): : 34 - 35