A predictive-reactive cross-dock rescheduling system under truck arrival uncertainty

被引:12
|
作者
Nasiri, Mohammad Mahdi [1 ]
Ahmadi, Naeime [2 ]
Konur, Dincer [3 ]
Rahbari, Ali [2 ]
机构
[1] Univ Tehran, Sch Ind Engn, Coll Engn, Tehran, Iran
[2] Univ Tehran, Dept Ind Engn, Alborz Campus, Tehran, Iran
[3] Texas State Univ, McCoy Coll Business Adm, Dept Comp Informat Syst & Quantitat Methods, San Marcos, TX USA
关键词
Cross-docking; Rescheduling; Uncertainty; Truck Scheduling; SCHEDULING PROBLEM; ALGORITHMS; FRAMEWORK; MODELS; TIMES;
D O I
10.1016/j.eswa.2021.115986
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In a cross-docking system, products are transferred from the suppliers to the customers without being held as inventory. One of the critical operational problems in cross-docking is scheduling inbound and outbound trucks. In practice, the inbound trucks can arrive late; consequently, the timing of the unloading/loading operations may be affected. This hinders the planned schedule's efficiency and may result in the infeasibility of this schedule. Even though the cross-dock scheduling problem is studied under operational uncertainties, the focus was on taking a proactive approach and creating a master schedule against such uncertainties. Nevertheless, from an operational perspective, any master schedule would require modifications as uncertainties unfold, i.e., rescheduling is needed. While rescheduling is studied in manufacturing, cross-dock rescheduling is not investigated. This study contributes to cross-dock scheduling research by investigating rescheduling at a cross-dock facility. Particularly, a periodic predictive-reactive rescheduling system in response to truck arrival uncertainty is proposed. This system consists of two main components: a rescheduling optimization model and a short interval repair policy. The rescheduling optimization model creates updated schedules at discrete review times and the short interval repair policy specifies how to handle trucks considering the delays. First, we present the rescheduling optimization model to minimize the deviation from the master schedule, which is created at the beginning of the planning horizon based on the scheduled truck arrivals. Then, three short interval repair policies are introduced. The rescheduling model is integrated with each of the three different short interval repair policies, resulting in three variations of the rescheduling system. Computational experiments are performed to analyse and compare the performance of the short interval repair policies under various settings, and managerial insights are presented.
引用
收藏
页数:17
相关论文
共 50 条
  • [21] Cost-stable truck scheduling at a cross-dock facility with unknown truck arrivals: A meta-heuristic approach
    Konur, Dincer
    Golias, Mihalis M.
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2013, 49 (01) : 71 - 91
  • [22] An application oriented multi-agent based approach to dynamic truck scheduling at Cross-dock
    Zouhaier, Houda
    Ben Said, Lamjed
    2016 17TH INTERNATIONAL CONFERENCE ON PARALLEL AND DISTRIBUTED COMPUTING, APPLICATIONS AND TECHNOLOGIES (PDCAT), 2016, : 233 - 239
  • [23] Predictive-reactive Strategy for Flowshop Rescheduling Problem: Minimizing the Total Weighted Waiting Times and Instability
    Tighazoui, Ayoub
    Sauvey, Christophe
    Sauer, Nathalie
    JOURNAL OF SYSTEMS SCIENCE AND SYSTEMS ENGINEERING, 2021, 30 (03) : 253 - 275
  • [24] Predictive-reactive Strategy for Flowshop Rescheduling Problem: Minimizing the Total Weighted Waiting Times and Instability
    Ayoub Tighazoui
    Christophe Sauvey
    Nathalie Sauer
    Journal of Systems Science and Systems Engineering, 2021, 30 : 253 - 275
  • [25] Adaptive memory red deer algorithm for cross-dock truck scheduling with products time window
    Zhou, Binghai
    Zong, Shi
    ENGINEERING COMPUTATIONS, 2021, 38 (08) : 3254 - 3289
  • [26] A customized genetic algorithm for solving multi-period cross-dock truck scheduling problems
    Khalili-Damghani, Kaveh
    Tavana, Madjid
    Santos-Arteaga, Francisco J.
    Ghanbarzad-Dashti, Mandokht
    MEASUREMENT, 2017, 108 : 101 - 118
  • [27] Dynamic Appointment Rescheduling of Trucks under Uncertainty of Arrival Time
    Xu, Bowei
    Liu, Xiaoyan
    Li, Junjun
    Yang, Yongsheng
    Wu, Junfeng
    Shen, Yi
    Zhou, Ye
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2022, 10 (05)
  • [28] A monolithic approach to vehicle routing and operations scheduling of a cross-dock system with multiple dock doors
    Dondo, Rodolfo
    Cerda, Jaime
    COMPUTERS & CHEMICAL ENGINEERING, 2014, 63 : 184 - 205
  • [29] A Two-Phase Greedy Heuristic for Cross-dock Scheduling of Truck Arrivals, Truck Departures and Shop-floor Operations
    Zheng, Feifeng
    Pang, Yaxin
    PROCEEDINGS OF THE 2019 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM 2019), 2019, : 83 - 88
  • [30] Scheduling of truck arrivals, truck departures and shop-floor operation in a cross-dock platform, based on trucks loading plans
    Serrano, Christian
    Delorme, Xavier
    Dolgui, Alexandre
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2017, 194 : 102 - 112