Dynamic order acceptance and capacity planning on a single bottleneck resource

被引:26
|
作者
Herbots, Jade [1 ]
Herroelen, Willy [1 ]
Leus, Roel [1 ]
机构
[1] Katholieke Univ Leuven, Dept Decis Sci & Informat Management, Louvain, Belgium
关键词
order acceptance; capacity planning; multiproject; stochastic dynamic programming;
D O I
10.1002/nav.20259
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We present a tactical decision model for order acceptance and capacity planning that maximizes the expected profits from accepted orders, allowing for aggregate regular as well as nonregular capacity. The stream of incoming order arrivals is the main source of uncertainty in dynamic order acceptance and the company only has forecasts of the main properties of the future incoming projects. Project proposals arrive sequentially with deterministic interarrival times and a decision on order acceptance and capacity planning needs to be made each time a proposal arrives and its project characteristics are revealed. We apply stochastic dynamic programming to determine a profit threshold for the accept/reject decision as well as to deterministically allocate a single bottleneck resource to the accepted projects, both with an eye on maximizing the expected revenues within the problem horizon. We derive a number of managerial insights based on an analysis of the influence of project and environmental characteristics on optimal project selection and aggregate capacity usage. (c) 2007 Wiley Periodicals, Inc.
引用
下载
收藏
页码:874 / 889
页数:16
相关论文
共 50 条
  • [41] An Integrated Production Planning and Order Acceptance Model with Flexible Due Dates
    Aouam, T.
    Brahimi, N.
    2013 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM 2013), 2013, : 1214 - 1218
  • [42] Dynamic seru order acceptance and scheduling with periodic worker assignment
    Wang, Lili
    Zhang, Zhe
    Yin, Yong
    INTERNATIONAL JOURNAL OF MANUFACTURING RESEARCH, 2022, 17 (02) : 172 - 201
  • [43] Cloud Capacity Planning and HSI based Optimal Resource Provisioning
    Sadashiv, Naidila
    Kumar, Dilip S. M.
    Goudar, R. S.
    PROCEEDINGS OF THE 2017 IEEE SECOND INTERNATIONAL CONFERENCE ON ELECTRICAL, COMPUTER AND COMMUNICATION TECHNOLOGIES (ICECCT), 2017,
  • [44] Integrated mill/resource capacity planning in the canadian forest industry
    Gunn, Eldon A.
    J-FOR, 2011, 1 (02): : 38 - 44
  • [45] INTEGRATED MILL/RESOURCE CAPACITY PLANNING IN THE CANADIAN FOREST INDUSTRY
    Gunn, Eldon A.
    J-FOR-JOURNAL OF SCIENCE & TECHNOLOGY FOR FOREST PRODUCTS AND PROCESSES, 2011, 1 (02): : 38 - 44
  • [46] Technique for evaluating implementation capacity of manufacturing enterprise resource planning
    Huang, Xi
    Ding, Xiang-Hai
    Tang, Ren-Zhong
    Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2007, 41 (02): : 319 - 324
  • [47] Profiling services for resource optimization and capacity planning in distributed systems
    Jiang, Guofei
    Chen, Haifeng
    Yoshihira, Kenji
    CLUSTER COMPUTING-THE JOURNAL OF NETWORKS SOFTWARE TOOLS AND APPLICATIONS, 2008, 11 (04): : 313 - 329
  • [48] Profiling services for resource optimization and capacity planning in distributed systems
    Guofei Jiang
    Haifeng Chen
    Kenji Yoshihira
    Cluster Computing, 2008, 11 : 313 - 329
  • [49] Capacity planning and scheduling for jobs with uncertainty in resource usage and duration
    Patra, Sunandita
    Pathan, Mehtab
    Mahfouz, Mahmoud
    Zehtabi, Parisa
    Ouaja, Wided
    Magazzeni, Daniele
    Veloso, Manuela
    JOURNAL OF SUPERCOMPUTING, 2024, 80 (15): : 22428 - 22461
  • [50] Reliability constrained capacity expansion planning of water resource systems
    Hinks, Robert W.
    ADVANCES IN WATER RESOURCES, 1980, 3 (03) : 99 - 105