Multisensor Railway Track Geometry Surveying System

被引:31
|
作者
Akpinar, Burak [1 ]
Gulal, Engin [1 ]
机构
[1] Yildiz Tech Univ, Dept Geomat Engn, TR-34210 Istanbul, Turkey
关键词
Geodesy; Global Positioning System; multisensor systems; rail transportation maintenance; NAVIGATION;
D O I
10.1109/TIM.2011.2159417
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Linear variable differential transformers (LVDTs) and inclinometers are widely used in many industrial establishments, particularly in the metrology area. These sensors are used by many engineering disciplines because of their high-precision characteristics. In addition, Global Navigation Satellite System (GNSS) receivers and total stations are widely used in geodesy. Using GNSS receivers is very popular, particularly for navigational purposes. In this paper, a new railway track geometry surveying system, which is designed by integrating the LVDT, inclinometer, GNSS receiver, and total station, is introduced. This new surveying system is an alternative to classical geodetic measurement methods that are often used for controlling the railway track geometry. Track gauge, super-elevation, gradient, and track axis coordinates, which are railway geometrical parameters, can be instantly determined while making measurements by using the new surveying system.
引用
下载
收藏
页码:190 / 197
页数:8
相关论文
共 50 条
  • [11] Optimal opportunistic tamping scheduling for railway track geometry
    Khajehei, Hamid
    Haddadzade, Mohammad
    Ahmadi, Alireza
    Soleimanmeigouni, Iman
    Nissen, Arne
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2021, 17 (10) : 1299 - 1314
  • [12] Prediction of railway track geometry defects: a case study
    Soleimanmeigouni, Iman
    Ahmadi, Alireza
    Nissen, Arne
    Xiao, Xun
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2020, 16 (07) : 987 - 1001
  • [13] Allocation of effective maintenance limit for railway track geometry
    Khajehei, Hamid
    Ahmadi, Alireza
    Soleimanmeigouni, Iman
    Nissen, Arne
    STRUCTURE AND INFRASTRUCTURE ENGINEERING, 2019, 15 (12) : 1597 - 1612
  • [14] The impact of summer heatwaves on railway track geometry maintenance
    Davies, Ben
    Andrews, John
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2021, 235 (09) : 1158 - 1171
  • [15] Effective time interval for railway track geometry inspection
    Kasraei A.
    Zakeri J.A.
    Archives of Transport, 2020, 53 (01) : 53 - 65
  • [16] Influence of geosynthetics in the structural layers on the railway track geometry
    Petriaev, A.
    GEOSYNTHETICS: LEADING THE WAY TO A RESILIENT PLANET, 12ICG 2023, 2024, : 1399 - 1403
  • [17] An Innovative Approach to Surveying the Geometry of Visibility Triangles at Railway Level Crossings
    Kampczyk, Arkadiusz
    SENSORS, 2020, 20 (22) : 1 - 23
  • [18] Estimating the Accuracy of Track-Surveying Trolley Measurements for Railway Maintenance Planning
    Sanchez, A.
    Bravo, J. L.
    Gonzalez, A.
    JOURNAL OF SURVEYING ENGINEERING, 2017, 143 (01)
  • [19] Development of Railway Track Geometry Indexes Based on Statistical Distribution of Geometry Data
    Sadeghi, J.
    JOURNAL OF TRANSPORTATION ENGINEERING-ASCE, 2010, 136 (08): : 693 - 700
  • [20] Out-of-Sequence Track for Distributed Multisensor System
    Jin Xue-bo
    Wang Lei-lei
    PROCEEDINGS OF THE 2009 2ND INTERNATIONAL CONGRESS ON IMAGE AND SIGNAL PROCESSING, VOLS 1-9, 2009, : 4799 - 4802