共 50 条
- [31] Direct power purchase by large consumers considering wind load uncertainty robust interval optimal scheduling [J]. Taiyangneng Xuebao/Acta Energiae Solaris Sinica, 2022, 43 (07): : 347 - 355
- [32] Multi-time scale optimal scheduling of regional integrated energy system considering wind power correlation [J]. Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2023, 43 (08): : 25 - 32
- [33] Power System Multi-day Stochastic Scheduling Considering the Uncertainty of CSP/wind Plants [J]. 2016 IEEE POWER AND ENERGY SOCIETY GENERAL MEETING (PESGM), 2016,
- [34] Optimal Scheduling of Integrated Energy System Considering Distributed Photovoltaic Power Fluctuation [J]. 2021 3RD ASIA ENERGY AND ELECTRICAL ENGINEERING SYMPOSIUM (AEEES 2021), 2021, : 932 - 937
- [35] Optimal Scheduling of Integrated Energy System Considering Integration of Electric Vehicles and Load Aggregators [J]. Shanghai Jiaotong Daxue Xuebao/Journal of Shanghai Jiaotong University, 2023, 57 (07): : 814 - 823
- [36] Reactive power optimal approach in rural power network considering load uncertainty [J]. Nongye Gongcheng Xuebao/Transactions of the Chinese Society of Agricultural Engineering, 2009, 25 (09): : 182 - 187
- [37] Optimal scheduling of wind-solar-hydrogen integrated energy system considering variable operating condition of fuel cell [J]. Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2023, 43 (12): : 151 - 156
- [38] Optimal Dispatch of Integrated Power and Gas Systems Considering Wind Power Uncertainty [J]. PROCEEDINGS OF THE 2019 14TH IEEE CONFERENCE ON INDUSTRIAL ELECTRONICS AND APPLICATIONS (ICIEA 2019), 2019, : 882 - 887
- [39] Low-carbon scheduling of power system with wind power considering uncertainty of both source and load sides [J]. Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2020, 40 (11): : 85 - 91
- [40] Coordinated scheduling of integrated electricity-gas energy system considering response characteristic of power-to-gas and wind power uncertainty [J]. Dianli Zidonghua Shebei/Electric Power Automation Equipment, 2021, 41 (09): : 24 - 30