Two-Machine Ordered Flow Shop Scheduling with Generalized Due Dates

被引:7
|
作者
Park, Myoung-Ju [1 ]
Choi, Byung-Cheon [2 ]
Min, Yunhong [3 ]
Kim, Kyung Min [4 ]
机构
[1] Kyung Hee Univ, Dept Ind & Management Syst Engn, 1732 Deogyeong Daero, Yongin 17104, Gyeonggi Do, South Korea
[2] Chungnam Natl Univ, Dept Business Adm, 99 Daehak Ro, Daejeon 34134, South Korea
[3] Incheon Natl Univ, Grad Sch Logist, 119 Acad Ro, Incheon 22012, Gyeonggi Do, South Korea
[4] Myong Ji Univ, Dept Ind Management & Engn, 116 MyongJi Ro, Yongin 449728, Gyeonggido, South Korea
关键词
Scheduling; ordered flow shop; generalized due dates; computational complexity; SEQUENCING PROBLEM;
D O I
10.1142/S0217595919500325
中图分类号
C93 [管理学]; O22 [运筹学];
学科分类号
070105 ; 12 ; 1201 ; 1202 ; 120202 ;
摘要
We consider a two-machine flow shop scheduling with two properties. The first is that each due date is assigned for a specific position different from the traditional definition of due dates, and the second is that a consistent pattern exists in the processing times within each job and each machine. The objective is to minimize maximum tardiness, total tardiness, or total number of tardy jobs. We prove the strong NP-hardness and inapproximability, and investigate some polynomially solvable cases. Finally, we develop heuristics and verify their performances through numerical experiments.
引用
收藏
页数:16
相关论文
共 50 条
  • [21] Approximation schemes for two-machine flow shop scheduling with two agents
    Luo, Wenchang
    Chen, Lin
    Zhang, Guochuan
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2012, 24 (03) : 229 - 239
  • [22] Two-machine Flow Shop Scheduling with Re-entrance
    Jing, Caixia
    Qian, Xingsan
    Tang, Guochun
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL II, 2008, : 528 - +
  • [23] Two-machine flow shop scheduling of polyurethane foam production
    Lin, Bertrand M. T.
    Lin, Y-Y
    Fang, K-T
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2013, 141 (01) : 286 - 294
  • [24] Integrated production - Transportation scheduling in a two-machine flow shop
    Feng, Zhou
    Liang, Gao
    Li, Nie
    TIRMDCM 2007: PROCEEDINGS OF THE FIRST INTERNATIONAL CONFERENCE ON TECHNOLOGY INNOVATION, RISK MANAGEMENT AND SUPPLY CHAIN MANAGEMENT, VOLS 1 AND 2, 2007, : 142 - 146
  • [25] A two-machine permutation flow shop scheduling problem with buffers
    Smutnicki, C
    OR SPEKTRUM, 1998, 20 (04) : 229 - 235
  • [26] Batch scheduling in a two-machine flow shop with limited buffer
    Agnetis, A
    Pacciarelli, D
    Rossi, F
    DISCRETE APPLIED MATHEMATICS, 1997, 72 (03) : 243 - 260
  • [27] Inverse scheduling: two-machine flow-shop problem
    Brucker, Peter
    Shakhlevich, Natalia V.
    JOURNAL OF SCHEDULING, 2011, 14 (03) : 239 - 256
  • [28] Coordinating scheduling with batch deliveries in a two-machine flow shop
    Pan, Jason Chao-Hsien
    Wu, Chih-Lun
    Huang, Han-Chiang
    Su, Chi-Shiang
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2009, 40 (5-6): : 607 - 616
  • [29] Flow shop scheduling with two distinct job due dates
    Koulamas, Christos
    Kyparisis, George J.
    COMPUTERS & INDUSTRIAL ENGINEERING, 2022, 163
  • [30] Flow shop scheduling with two distinct job due dates
    Koulamas, Christos
    Kyparisis, George J.
    Computers and Industrial Engineering, 2022, 163