共 50 条
- [44] CALCULATION AND ANALYSIS OF HYDRAULIC AUTOMATIC CLIMBING FORMWORK EQUIPMENT FOR SUPER-HIGH BUILDING CONSTRUCTION JOURNAL OF THE INTERNATIONAL ASSOCIATION FOR SHELL AND SPATIAL STRUCTURES, 2021, 62 (01): : 24 - 36
- [45] Effect of Formwork Removal Time Reduction on Construction Productivity Improvement by Mix Design of Early Strength Concrete APPLIED SCIENCES-BASEL, 2020, 10 (20): : 1 - 15
- [46] Productivity excellence through an integrated construction management system for the building and construction industries ADVANCES IN BUILDING TECHNOLOGY, VOLS I AND II, PROCEEDINGS, 2002, : 1729 - 1736
- [47] FORMWORK FOR CONCRETE CONSTRUCTION - RICOUARD,MJ CONCRETE CONSTRUCTION, 1984, 29 (08): : 760 - 760
- [49] CODES AND STANDARDS REGULATE FORMWORK CONSTRUCTION CONCRETE CONSTRUCTION, 1985, 30 (03): : 271 - 273
- [50] Musculoskeletal Disorders in Concrete Formwork Construction CONSTRUCTION RESEARCH CONGRESS 2022: HEALTH AND SAFETY, WORKFORCE, AND EDUCATION, 2022, : 304 - 313