Determining Contingencies in the Management of Construction Projects

被引:11
|
作者
Ortiz, Jose I. [1 ]
Pellicer, Eugenio [2 ]
Molenaar, Keith R. [3 ]
机构
[1] Univ Carlos III, Madrid, Spain
[2] Univ Politecn Valencia, Sch Civil Engn, Camino Vera S-N, E-46022 Valencia, Spain
[3] Univ Colorado, Construct Engn & Management, Boulder, CO 80309 USA
关键词
buffer; contingency; risk management; project; uncertainty; COST CONTINGENCY; RISKS; DESIGN;
D O I
10.1177/8756972819827389
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
This research describes the managerial approaches that contractors follow to determine different types of contingencies in construction project management. Two large Spanish general contractors were selected for an in-depth analysis. Interviews and surveys were conducted with six additional companies to explore the external validity of the findings. Managers constrain time and cost buffers through project objectives, applying heuristics to determine inventory buffers. The management of capacity buffers is entrusted to subcontractors. The contractors take advantage of scope and quality buffers to meet project objectives but rarely share these buffers with the owner, unless the owner is an internal client.
引用
收藏
页码:226 / 242
页数:17
相关论文
共 50 条